My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/1972
CBCC
>
Meetings
>
1970's
>
1972
>
10/25/1972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:24:55 AM
Creation date
6/10/2015 2:06:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/25/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />I , <br />i <br />I <br />WRIGHT, REPRESENTATIVE OF MID -FLORIDA UTILITIES CO. <br />EDGENERAL WATERWORKS •_� SOUTHEAST REGION <br />9555 NORTH KENDALL DRIVE, SUITE 2-8, MIAMI, FLA. 33156 (305) 274-5211 <br />October 20, 1972 <br />Mr. Jack G. Jennings, County Administrator <br />Indian River County <br />Vero Beach, Florida 32960 <br />Dear Mr. Jennings: <br />At the last meeting of the Commissioners of Indian <br />River County, we stipulated that we would provide the Com- <br />missioners with further details and a realistic time schedule <br />for the improvements to the treatment. facilities. This letter <br />will serve to fulfill that commitment. <br />Before going into that phase, let me say that we do <br />not envision the immediate expansion of our service area. Our <br />goal is to provide good service to our existing customers and <br />the consolidation of our existing service area. Expansion <br />can be a fine goal, but never at the expense of existing <br />customers. <br />To this end, we have recently modified the mode of <br />operations of our existing facilities. We have also provided <br />additional instruction on this operation to our local personnel. <br />This has resulted in an immediate improvement in the treatment <br />and our customers are now being furnished with good water. <br />The proposed improvements to our facilities and <br />operation are as follows: <br />(1) Install an additional 5' 0 x 8' zeolite filter <br />with all related appurtenances. <br />(2) Install a tank level indicator, recorder, with <br />3 pump controllers. <br />(3) Install a master meter with an indicator, recorder, <br />and totalizer. <br />(4) Install chlorinator with 2 rate of feed valves, <br />2 injector pumps, automatic switch -over, and 2 scales. 1- <br />A MEMBER OF THE INTERNATIONAL UTILITIES GROUP <br />soox A eAu, 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.