Laserfiche WebLink
USDA—FHA <br />Form FHA 442-19 AGREEMENT FOR ENGINEERING SERVICES <br />(Rev. 7-21-67) <br />THIS AGREEMENT, made this ._ _ __—._______. day of ...________� __r --_--- <br />by a0 between .Ahs_-�n��an River County_,Board of County _Commissioners ,hereinafter <br />Sverdrup&Parcel and Associates, Inc. and <br />referred to as the OWNER, and ..6ejn..dorf_ and Associates, .Inc :,_A JOINT VENTURE + <br />hereinafter referred to as the ENGINEER: <br />The OWNER intends to construct a wt�r._ supplytreatment,_transmission^ and distribution <br />tnd_;�_s�nitary__sewjige collections transmission,_treatment and rdisposal �system. <br />River Florida <br />is _-nd1 dljCounty, State of .__.._�__ ___.__...-________ ______ ________. , which <br />may be paid for in part with financial assistance from the United States of America, acting through the Farmers Home Admin- <br />istration of the United States Department of Agriculture, hereinafter referred to as FHA, pursuant to the Consolidated Farmers <br />Home Administration Act of 1961 as amended (7 U. S. C. 1921 et seq.), and the ENGINEER agrees to perform the various <br />professional engineering services required for the design and construction of said system; <br />• WITNESSETH: <br />That for and in consideration of the mutual covenants and promises between the parties hereto, it is hereby agreed: <br />SECTION A — ENGINEERING SERVICES <br />That the ENGINEER shall furnish basic engineering services as follows: <br />* 1. The ENGINEER will conduct preliminary investigations required to determine project feasibility. <br />* 2. The ENGINEER will prepare preliminary plans and cost estimate. <br />* 3. The ENGINEER will prepare an engineering report following FHA instructions and guides. <br />* 4. The ENGINEER will furnish ten copies of the preliminary engineering report, cost estimates, and layout maps to <br />the OWNER. <br />S. The ENGINEER will attend conferences with the OWNER and representatives of the FHA and other interested parties. <br />6. After the preliminary engineering report has been reviewed by FHA and the OWNER directs the ENGINEER to proceed, <br />the ENGINEER will perform the necessary design surveys, accomplish the detailed design of the project, prepare <br />detailed plans, specifications and contract documents, and make a final cost estimate based on the final design for <br />the entire system. However, design surveys, as used in this Section A-6, are understood to be limited to those <br />required to perform the design and to prepare the detailed plans and specifications. It is understood that in the design <br />and preparation of detailed plans and specifications for such elements of water works and sewerage projects as water <br />treatment plants, sewage treatment plants, dams and reservoirs, the design surveys for such elements also shall be <br />performed by the ENGINEER but the ENGINEER shall be additionally compensated therefor as provided in Sections <br />D and E hereof, It is also understood that if subsurface explorations such as borings, soil tests and the like are <br />required to determine amounts of rock excavation or foundation conditions, the ENGINEER will furnish supervision <br />of said explorations without additional charge, but the costs incident to such explorations, no matter whether they <br />are performed by the ENGINEER or by others, shall be paid for by the OWNER as set out in Sections D and E hereof. <br />7. The contract documents furnished by the ENGINEER under Section A-6 above shall utilize standard FHA forms for <br />the notice to bidders, instructions to bidders, proposal form, contract agreement form, general conditions, and payment <br />and performance bonds. Special conditions and the notice of award and the notice to proceed shall also be prepared <br />by the ENGINEER. All of these documents shall be subject to FHA approval. <br />8. Prior to the advertisement for bids, the ENGINEER for each contract will provide not to exceed 10 copies of detailed <br />plans, specifications, and contract documents for use of the OWNER, FHA, and the appropriate Federal, State, and <br />local agencies from whom approval of the project must be obtained. The cost of not to exceed 10 copies of such <br />plans, specifications, and contract documents shall be included in the basic compensation paid to the ENGINEER. <br />9. The ENGINEER will furnish additional copies of plans, specifications and contract documents as required by pro- <br />spective bidders, material suppliers, and other interested parties, but may charge for the actual cost of such copies. <br />Upon award of each contract, the ENGINEER will furnish to the OWNER five sets of the plans, specifications, and <br />contract documents for execution, the cost of these sets being included in the basic compensation paid to the <br />ENGINEER. Original documents, survey notes, tracings, and the like, except those furnished to the ENGINEER by <br />the OWNER, are and shall remain the property of the ENGINEER. <br />*The ENGINEERwill furnish these services under a separate agreement with the OWNER <br />and at no cost to this agreement. <br />FHA 442-19 (Rev. 7-21-67) <br />DEC Pn1972 <br />M <br />