Laserfiche WebLink
SECTION B —COMPENSATION FOR BASIC ENGINEERING SERVICES <br />That the OWNER shall compensate the ENGINEER for basic engineering services based on percentages of the Total <br />Actual Construction Costs shown in Table I and Table 11 set forth in Attachment I which is attached hereto and made a <br />part hereof. The percentage factors applicable shall be those figures adjacent to the Total Actual Construction Cost <br />column. The appropriate percentage factor shown in Table 11 shall be applicable to all compensation computations except <br />those with respect to the following items; <br />Water_ supply,_ treatment, storage and pumping -facilities and -all �sanitary <br />�»�_� <br />sewerage facilities. <br />_ +.L. T T•!'n'1.1'"f •A.. Y - .A. ft i`l'nn 4'.�.r ..r. <br />to which items the percentage factor shown in Table 1 shall apply; provided, however, if the total actual construction costs <br />is less than the lowest total actual construction cost figure shown on Attachment I, the OWNER agrees to pay the ENGINEER <br />Nine thousand and .0 100 ------------------- 9,000 00 <br />`a total fee of...__._....____.._.._._..___..__........----...� .__...._.»_..__...______....____.�...._. Dollars ($ ..._____� _...-----__-- ). <br />The construction costs on which the compensation for bosic engineering services is determined shall exclude legal fees, <br />administrative costs, engineering fees, land rights acquisition costs, water costs, and interest expense incurred during the <br />construction period. The compensation for basic engineering services shall be payable as follows: <br />0.00 <br />1. The sum of-----------------------11IIIle _-_-___»__-- Dollars ($ <br />after the review of the preliminary engineering report by the FHA and acceptance by the OWNER. <br />2. A sum which together with the specific sum set forth in Section B-1 above equals seventy percent (707o) of the total <br />cempensation based on the final cost estimate after completion and submission of the final plans, specifications, <br />cost estimates, and contract documents, and the acceptance of the same by the OWNER and FHA <br />3. A sum equal to ten percent (10%) of the total compensation based on construction contract costs immediately after <br />the construction contracts are awarded. <br />4. A sum equal to twenty percent (20%) of the total compensation based on the actual construction cost will be paid on <br />a periodic basis during the construction period on percentage ratios identical.to those approved by -the ENGINEER <br />as a basis upon which to make partial payments to the contractor(s). However, final payment under this paragraph <br />and of such additional sums as are due the ENGINEER by reason of any necessary adjustments in the payment com- <br />putations will be in an amount so that the aggregate of all sums paid to the ENGINEER will equal one hundred percent <br />(100%) of the basic compensation determined on actual total construction costs. Final payment shall not be made <br />until it is determined that all services required by this Agreement have been completed except for the services set <br />forth in Section A-21 hereof. If the total actual construction cost is less than the lowest total actual construction <br />' cost figure shown on Attachment I and the fee to be paid to the ENGINEER is a specific amount as set forth above, <br />i the percentage payments due the ENGINEER under Section B-2 thru 4, inclusive, shall be computed by applying <br />the applicable percentage to the specified total fee. <br />SECTION C — COMPENSATION FOR RESIDENT INSPECTION <br />If the OWNER requests in writing the ENGINEER will provide detailed, full-time, resident, construction inspection, <br />including construction staking, and the OWNER agrees to pay the ENGINEER for such service in accordance with the schedule <br />set out in Section E hereof. The ENGINEER will render to OWNER for such services an itemized bill, separate from any <br />other billing, at the end of each month for compensation for such services performed hereunder during such month, the same <br />to be due and payable by OWNER to the ENGINEER on or before the 10th day of the following month. <br />3, <br />Boal <br />DEC 2p1972 �.� is 1-60 <br />