My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-29
CBCC
>
Ordinances
>
1990'S
>
1993
>
1993-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 1:59:04 PM
Creation date
9/30/2015 4:01:54 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1993-29
Adopted Date
09/07/1993
Ordinance Type
Land Development Regulations Amendments
State Filed Date
09\15\1993
Code Number
Amend Ch. 901,902,911,912,913,914,915,
Subject
Land Development Regulations Amend Various Chapters
Codified or Exempt
Codified
Archived Roll/Disk#
2743
Supplemental fields
SmeadsoftID
1134
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. The developer is exempted from providing a <br />sidewalk segment(s) along an unpaved <br />thoroughfare plan roadway if the roadway is <br />not scheduled for improvement on the Cbunty's <br />20 -Year Roadway Improvements plan Schedule. <br />The developer may be exempted from providing a <br />sidewalk segment(s) by obtaining a <br />determination from the Public Works and <br />Community Development Directors that the need <br />for a sidewalk seament(s) along the adjacent <br />physical or design constraints. <br />b. Method. When re( <br />required sidewalk <br />i. Construct th <br />the roadwal <br />aired to construct or <br />seument(s), the develc <br />required sidewalk s <br />and correspondin <br />are desiqnated as_ <br />roviae a <br />r shall: <br />nt(s) if <br />sidewalk <br />pedestrian corridor and if construction can <br />satisfy the design and safety criteria of <br />subsection 914.15(6)(a), as determined by the <br />Public Works Director or the Director's <br />annnintPrl riesianee. As an alternative, the <br />developE <br />out for <br />describe <br />Transfer <br />construct <br />to <br />the <br />the <br />required <br />County <br />sidewalk <br />the <br />obli <br />tion to <br />nt(s) by <br />�1 to one <br />ted cost <br />to construct the required sidewalx segment(s) <br />and executing an Agreement for the Transfer of <br />Responsibility for Required Improvements. <br />The developer shall be responsible for <br />clearing and grading the intended location of <br />the required sidewalk segment(s) at the time <br />clearing and grading for the development <br />project is performed. The value of such <br />clearing and grading shall be reflected in the <br />cash payment amount provided by the developer. <br />The cleared path shall be approved by the <br />Public Works Department and shall be selected <br />so as to maximize tree preservation while <br />maintaining compliance with the sidewalk <br />design specifications listed in subsection <br />914.15(6)(a). <br />Timing. The developer shall be resF <br />providing the required sidewalk se <br />compliance with subsection 914.15(6)(b) <br />prior to receiving an equivalent Ce <br />Occunancv for the Droject. However, <br />sidewa <br />gment(s) in <br />l.b.i or ii. <br />rtificate of <br />in the event <br />act the required <br />s n h s P c t i o n <br />fora period of two (2) years beyond the final plat <br />approval date of the corresponding_ subdivision <br />development. In electing to Bond -out for <br />Construction, the developer shall providea <br />completed Contract for Construction for Remaining <br />Required Improvements and post security to <br />Coding: Words in • • -• • type are deletions from existing law. <br />Words underlined are additions. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.