My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-21
CBCC
>
Ordinances
>
1990'S
>
1997
>
1997-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2019 10:34:02 AM
Creation date
9/30/2015 3:54:30 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1997-21
Adopted Date
07/15/1997
Ordinance Type
Land Development Regulations Amendments
State Filed Date
07\24\2016
Code Number
Chapters 910,911,954,971
Subject
Concurrency; Zoning; Off Street Parking; Land Use Criteria, Specific
Codified or Exempt
Codified
Archived Roll/Disk#
2744
Supplemental fields
SmeadsoftID
1006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 97- 21 <br />B. LDR Section 954.05 for health and fitness center parking is hereby amended to <br />establish a standard for health and fitness centers, to read as follows: <br />(27.1) Health & Fitness Center: One space per 200 square feet of building area, <br />for any health and fitness center without outdoor facilities (e.g. pools, tennis <br />courts, etc.). <br />One space per 300 square <br />feet of <br />building <br />area for <br />centers with <br />outdoor <br />facilities, <br />(a) Sanitary <br />sewer <br />facilities. <br />water <br />supply. <br />The sanitary <br />plus additional spaces <br />as required <br />sewer <br />based <br />on the type <br />water portion <br />of outdoor <br />of the concurrency <br />management <br />C. LDR Section 954.05(29) for hotel and motel parking is hereby amended to read as <br />follows: <br />PART 3. Concurrency Regulations Update <br />A. LDR section 910.09(l)(a) is hereby amended to read as follows: <br />For purposes of evaluating concurrency determination applications, the <br />supply (capacity of a facility) shall be determined by adding together: <br />The total existing capacity of the facility: <br />Design capacity of the sanitary sewer treatment plant <br />measured by gallons per day for sanitary sewer facilities; <br />b. Design capacity of the potable water plant measured by <br />gallons per day for potable water facilities; and <br />a. Construction of the new facilities is underway at the time <br />the application for the concurrency determination is being <br />evaluated; <br />b. The new facilities are the subject of a binding executed <br />contract for the construction of the facilities or the provision <br />of services at the time the application for concurrency <br />determination is being evaluated; <br />(a) Sanitary <br />sewer <br />and potable <br />water <br />supply. <br />The sanitary <br />sewer <br />and <br />potable <br />water portion <br />of the concurrency <br />management <br />data <br />base <br />will <br />consist <br />of <br />updated <br />information <br />regarding <br />supply <br />and demand <br />for <br />each <br />sanitary <br />sewer <br />facility. <br />balance <br />demand) <br />or potable <br />water <br />The <br />resulting <br />(supply <br />will <br />constitute <br />the <br />available capacity <br />for <br />each <br />facility. <br />No <br />concurrency <br />determination <br />certificate will <br />be issued <br />when the <br />available <br />capacity <br />is less <br />than demand <br />projected to be <br />generated <br />by a proposed <br />application. <br />For purposes of evaluating concurrency determination applications, the <br />supply (capacity of a facility) shall be determined by adding together: <br />The total existing capacity of the facility: <br />Design capacity of the sanitary sewer treatment plant <br />measured by gallons per day for sanitary sewer facilities; <br />b. Design capacity of the potable water plant measured by <br />gallons per day for potable water facilities; and <br />a. Construction of the new facilities is underway at the time <br />the application for the concurrency determination is being <br />evaluated; <br />b. The new facilities are the subject of a binding executed <br />contract for the construction of the facilities or the provision <br />of services at the time the application for concurrency <br />determination is being evaluated; <br />
The URL can be used to link to this page
Your browser does not support the video tag.