My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1973
CBCC
>
Meetings
>
1970's
>
1973
>
1/24/1973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:26:50 AM
Creation date
6/10/2015 2:30:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/24/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P . - <br />Q <br />7. PIIASING OUT OF EXISTING <br />PLANTS OWNED OR 0PERATED BY OTHERS <br />In order to comply with regulations promulgated by the State of Florida <br />Department of Pollution Control and the United States Environmental Protection <br />Agency, it is essential that all existing sewage treatment plants, within <br />Region II, whether privately or municipally owned, whether under franchised <br />operation or not, be phased out at the earliest possible date and services <br />provided by such plants be connected either to the County System or directly <br />to the City System. <br />Both parties hereto pledge to exert every possible effort to accomplish <br />centralized operation. • Since none of the existing plants are within the City's <br />legal limits or jurisdiction, it would appear that the County, either directly or <br />through specially created Authorities, would be the only agency legally em- <br />powered to undertake the control or acquisition of private plants. <br />8. TERM OF AGREEMENT <br />This agreement shall remain in force and effect for a period of ten years from <br />date hereof, or until such time as the review hereinafter specified shall cause <br />both parties to modify, alter or terminate. Either party may request the review <br />hereinafter described. <br />On or before January 1, 1978, the parties hereto agree to cause an engineering <br />report to be prepared by their respective Consulting Engineers, reviewing all <br />phases of the operation to date of the reports, including but not limited to: <br />A. Capacities of water and sewage plants and probable needs for capital <br />improvements to increase capacity, modify or increase degree of treatment, <br />or to comply with latest requirements of regulatory agencies, Federal or <br />State, having jurisdiction. <br />B. Recommended capital contribution by the County toward capital expansions <br />should need be indicated as above and recommended by the Consulting <br />Engineers. <br />13 <br />-5- <br />,SAN197 18 . 342 <br />
The URL can be used to link to this page
Your browser does not support the video tag.