Laserfiche WebLink
ORDINANCE NO. 2007-013 <br />(4) In no event shall more than nine (9) months elapse between such progress <br />reports to the County Administrator. <br />(D) Reports on Compliance with Categorical Pretreatment Standard Deadline. Within <br />ninety (90) days following the date for final compliance with applicable categorical <br />pretreatment standards, or in the case of a new source following commencement of the <br />introduction of wastewater into the POTW, any user subject to such pretreatment <br />standards and requirements shall submit to the County Administrator a report containing <br />the information described in section 201.76(6)(4) through and including (6) of this Part. <br />For users subject to equivalent mass or concentration limits established in accordance <br />with the procedures in Rule 62-625.410(4), FAC, this report shall contain a reasonable <br />measure of the user's long-term production rate. For all other users subject to <br />categorical pretreatment standards expressed in terms of allowable pollutant discharge <br />per unit of production (or other measure of operation), this report shall include the user's <br />actual production during the appropriate sampling period. All compliance reports must <br />be signed and certified in accordance with section 201.73(F) of this Part. <br />(E) Periodic Compliance Reports. <br />(1) All significant industrial users shall, at a frequency determined by the County <br />Administrator but in no case less than twice per year (in June and December), submit a <br />report indicating the nature and concentration of pollutants in the discharge which are <br />limited by pretreatment standards and the measured or estimated average and <br />maximum daily flows for the reporting period. All periodic compliance reports must be <br />signed and certified in accordance with section 201.73(F) of this Part. <br />(2) All wastewater samples must be representative of the user's discharge. <br />Wastewater monitoring and flow measurement facilities shall be properly operated, kept <br />clean, and maintained in good working order at all times. The failure of a user to keep <br />its monitoring facility in good working order shall not be grounds for the user to claim <br />that sample results are unrepresentative of its discharge. <br />(3) If a user subject to the reporting requirement in this section monitors any <br />pollutant more frequently than required by the County Administrator, using the <br />procedures prescribed in section 201.76(K) of this Part, the results of this monitoring <br />shall be included in the report. <br />(F) Reports of Changed Conditions. <br />(1) Each user must notify the County Administrator of any planned significant <br />changes to the user's operations or system, which might alter the nature, quality, or <br />volume of its wastewater at least ninety (90) days before the change. <br />(2) The County Administrator may require the user to submit such information as <br />may be deemed necessary to evaluate the changed condition, including the submission <br />of a wastewater discharge permit application under section 201.73(E) of this Part. <br />99 <br />