My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-023
CBCC
>
Ordinances
>
2000's
>
2008
>
2008-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2019 2:43:23 PM
Creation date
9/30/2015 4:20:17 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
l;lkkjkjjhjkvf2008-023
Adopted Date
12/19/2008
Agenda Item Number
4.A.1.
Ordinance Type
Land Development Regulation Amendments
State Filed Date
12\30\2008
Entity Name
Mining Regulations
Code Number
Chapter 943, 971, 934, 938, and 971
Subject
Mining and Excavation
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
5336
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008- 023 <br />* (i) A comprehensive dust and spillage control plan that, at a minimum, addresses the <br />following: <br />treatment of stockpiles (including stockpile shape "doming"), on-site <br />processing areas and loading areas, <br />control of dust from truck operations on site and on the project haul route; <br />methods of treatment, such as spraying and watering systems, other dust <br />suppressants, devices and techniques, that prevent or minimize tracking <br />material off-site; <br />- use of mechanical dust recovery devices and techniques; <br />method and timing of re -vegetation in conjunction with excavation phases; <br />method of preventing or minimizing, and cleaning up, material spillage <br />along the haul route; and <br />applicable items from the county's list of mining operation bmps. <br />* (i) Noise modeling data and analysis demonstrating compliance with Chapter 974 noise <br />and nuisance requirements. <br />* (k) Evaluation of project impacts on haul route roads and haul route bridges and <br />culverts if Public Works Department/Traffic Engineering requires such an evaluation <br />as a result of the traffic impact methodology meeting. <br />* (I) Written and graphic information displayed on the site plan demonstrating <br />compliance with section 934.07 requirements. <br />* (m) An engineer's itemized estimate of the cost to restore the site in accordance with <br />Chapter 934 requirements. Such estimate shall include a calculation of 125% of the <br />estimated cost. <br />* (n) Description and photo -documentation of the type and condition of vegetation on-site <br />and description of the observable type and condition of vegetation on adjacent sites. <br />*These items may be submitted after initial review by the Technical Review Committee (TRC). <br />SECTION #4: <br />Re -number old Section 934.05 to take the place of reserved section 934.06 and read as follows: <br />Section 934.056. Wa-t-en:a- n ag men4 Mining standards. <br />(1) Procedural Sequence <br />Mining operations are subject to the following procedural sequence: <br />(a) Discussion or "pre -application" meeting with SJRWMD. <br />Double Underline Text: Non Workshop Changes <br />Bold Underline: Additions to Ordinance <br />Stake-t-hrough: Deleted Text from Existing Ordinance <br />F:\ Community Development\Users\CurDevAORDINANCE\2008\2008- 934 Excavation(afterl2-19-08).RTF <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.