Laserfiche WebLink
2008- 023 <br />(b) Traffic impact methodology meeting with Public Works/Traffic Engineering. <br />(c) Site plan pre -application conference. <br />(d) Formal site plan submittal. <br />(e) Initial TRC review. <br />(f) Final TRC review. <br />(g) Planning & Zoning Commission review and approval. <br />I. Reviewed by Board of County Commissioners if appealed. <br />(h) Initial annual mining permit. <br />(i) "Pre-construction"/site work meeting with staff. <br />(j) Annual mining permit renewal. <br />(k) Site restoration and final inspection/close-out. <br />(2) Littoral Zone and Water Management <br />On project sites exceeding ten (10) acres in area, any excavation or mining activity in the <br />unincorporated county which results in the creation or expansion of a waterbody (as defined in <br />Chapter 901) shall be subject to the following standards, except as specifically exempted in Section <br />934.04 of this chapter. The requirements of this section shall not apply to small lot single-family <br />subdivisions, which, as designated in Section 971.41(9), are expressly intended to provide workforce <br />or affordable housing. <br />(1)01 A littoral zone(s) shall be established as part of the created waterbody. A design and <br />management plan must be submitted which shall: <br />Include a topographic map of the proposed littoral zone(s) showing the control <br />elevation contour and the minus two -and -one -half -foot control water elevation <br />contour, and include a cross-sectional view of the littoral zone(s) planting design, <br />showing the required slopes from the top of the bank to a depth of two and one-half <br />(2 1.12) feet below the control water elevation; <br />(b)2. Specify how vegetation is to be established, including the extent, method, type and <br />timing of any planting provided; <br />(c)3. Provide a description of any water management procedures to be followed in order <br />to ensure the continued viability and health of the littoral zones* <br />(d-)4. Include a plan view which documents the location and extent of the littoral zones, <br />including the percentage of the waterbody surface area (at control elevation) <br />covered by vegetated littoral zones. <br />Donnie Underline Text: Non Workshop Changes <br />Bold Underline: Additions to Ordinance <br />Strike -through+ Deleted Text from Existing Ordinance <br />F:\Community Development\Users\CurDev\ORDINANCE\2008\2008- <br />934 Excavation(afterI2-19-08).RTF <br />8 <br />