My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-023
CBCC
>
Ordinances
>
2000's
>
2008
>
2008-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2019 2:43:23 PM
Creation date
9/30/2015 4:20:17 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
l;lkkjkjjhjkvf2008-023
Adopted Date
12/19/2008
Agenda Item Number
4.A.1.
Ordinance Type
Land Development Regulation Amendments
State Filed Date
12\30\2008
Entity Name
Mining Regulations
Code Number
Chapter 943, 971, 934, 938, and 971
Subject
Mining and Excavation
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
5336
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008- 023 <br />1. Upon receipt of a project hydrology report, the county has 60 days to provide <br />the applicant comments on the hydrology report. Prior to scheduling the <br />project for consideration by the Planning & Zoning Commission, the applicant <br />shall respond to each comment in writing. <br />(4) Traffic and Nuisance Mitigation <br />(a) The noise and nuisance requirements of Chapter 974 shall be satisfied. Normal <br />operation of vehicles shall be deemed to meet Chapter 974 requirements. <br />1. Pumps, crushers, and processing equipment (including portable equipment <br />but not including vehicles) used on site shall be placed behind berms, located <br />below surrounding ground level, or equipped with mufflers (e.g. "turbo -style' <br />mufflers) or similar devices that significantly reduce the level of emitted noise. <br />(b) Dust/particulates and material spillage shall be controlled in accordance with the <br />approved project comprehensive dust and spillage control plan. <br />(c) Material stockpiles shall not exceed a height of 25 feet above the grade of the adjacent <br />project site perimeter. <br />(d) For purposes of these mining regulations, "haul route" shall mean the roadway <br />segment(s) traveled by haul truck traffic from the mining site to the nearest paved <br />major road intersection(s). The project haul route(s) shall be determined by the <br />Public Works director or his designee as a result of the traffic impact methodology <br />meeting with Public Works/Traffic Engineering. <br />(e) Unpaved haul routes shall be improved and maintained to the following standards: <br />1. Minimum gradable base of twelve (12) inches of suitable road base material <br />(material that can meet the compaction standard below) shall be provided for <br />the duration of the mining project. The mining operator(s) shall add gradable <br />base material as directed by the Public Works Director or his designee to meet <br />this gradable base material standard. <br />2. Base material shall be suitably compacted to meet LBR (load bearing ratio) 40 <br />standards. <br />3. The minimum gradable haul route width shall be 24 feet. <br />4. Where unpaved haul routes or haul route segments are allowed and the <br />anticipated project haul truck traffic from the proposed mine and approved <br />mines sharing the same haul route segment(s) exceed an average of 500 truck <br />trip ends per day las defined in section (4)0) below', the unpaved haul route <br />segment(s) shall be improved and maintained to the following standards: <br />a. Minimum sub -base of twelve (12) inches and twelve (12) inches of <br />suitable road base material (material such as coquina or structural <br />equivalent approved by the Public Works Director or his designee that <br />can meet the compaction standard below) shall be provided for the <br />duration of the mining project. <br />b. Road material shall be suitably compacted to meet LBR (load bearing <br />ratio) 1.00 standards. <br />c. The minimum gradable haul route width shall be 24 feet. <br />Double_Underline Text: Non Workshop Changes <br />Bold Underline: Additions to Ordinance <br />Ste-ke-through+ Deleted Text from Existing Ordinance <br />F:AComnumity Development \Users\CurDevAORDINANCE\2008\2008- <br />934 Excavation(afterl2-I9-08).RTF <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.