My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-023
CBCC
>
Ordinances
>
2000's
>
2008
>
2008-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2019 2:43:23 PM
Creation date
9/30/2015 4:20:17 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
l;lkkjkjjhjkvf2008-023
Adopted Date
12/19/2008
Agenda Item Number
4.A.1.
Ordinance Type
Land Development Regulation Amendments
State Filed Date
12\30\2008
Entity Name
Mining Regulations
Code Number
Chapter 943, 971, 934, 938, and 971
Subject
Mining and Excavation
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
5336
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008- 023 <br />required road maintenance within three (3) working days of written notice. <br />Forfeited security shall be used to fund the cost of road maintenance work <br />performed. Upon forfeiture, mining operation hauling shall cease and shall not <br />re -commence until adequate road maintenance is performed and new road <br />maintenance security is submitted. The unexpended balance of the security shall <br />be returned to the mining owner/operator or applied to the newly posted security. <br />(4) Where vehicles hauling excavated materials use public roads, such vehicles shall be <br />covered in a manner to prevent fill spillage, to the satisfaction of the county engineer; <br />(5) All hauling vehicles shall have the trucking company name (or truck owner's name if <br />vehicle is privately owned) prominently displayed on the sides of the vehicle. <br />SECTION #7 <br />Section 934.09 is hereby replaced with wording to read as follows: <br />Section 934.09 Compliance and Enforcement <br />(1) Enforcement and Penalties for Violations <br />(a) Generally <br />The county may impose but is not limited to the following types of penalties for <br />violations of the approved project site plan, mining permit, and any conditions <br />attached thereto: <br />• Stop work for all or a portion of the mining operation <br />• Forfeiture of posted security <br />• Termination of mining permit <br />Penalties imposed shall be based upon the following: <br />• Timelines and adequacy of operator/owner response to take corrective <br />action. Harsher penalties shall be imposed for low and/or inadequate <br />operator/owner responses. <br />• Severity and degree of violation(s). Harsher penalties shall be imposed <br />for violations that have broader and/or longer lasting negative impacts. <br />• Number of violations. Harsher penalties shall be imposed if numerous <br />violations have occurred. <br />(b) Violation and Compliance Process <br />Upon observing a potential violation, county staff shall contact the mining <br />operator or owner, advise him/her of the potential violation and corrective <br />action, and document the observation and contact with the operator or owner. <br />If the operator or owner takes immediate and appropriate corrective action and <br />DQuble_U.ndcrline Text: Non Workshop Changes <br />Bold Underline: Additions to Ordinance <br />Ste1Ee-through: Deleted Text from Existing Ordinance <br />F:ACommunity Development\Users\CurDcvAORDINANCE\2008\2008- <br />934 Excavation(afterl2-19-08)12"fF <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.