My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-023
CBCC
>
Ordinances
>
2000's
>
2008
>
2008-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2019 2:43:23 PM
Creation date
9/30/2015 4:20:17 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
l;lkkjkjjhjkvf2008-023
Adopted Date
12/19/2008
Agenda Item Number
4.A.1.
Ordinance Type
Land Development Regulation Amendments
State Filed Date
12\30\2008
Entity Name
Mining Regulations
Code Number
Chapter 943, 971, 934, 938, and 971
Subject
Mining and Excavation
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
5336
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008- 023 <br />1 The extraction process and hauling of excavated materials from the <br />premises project site is completed within a two (2) months continuous <br />period of time beginning with the initial transfer of material off the <br />development project site. <br />following the issuance of The transfer of material off site shall not occur <br />until a county land development permit Of has been issued, a land <br />development permit waiver has been granted, or release of an approved <br />a site plant has been approved and released <br />that sSuch extraction and hauling is limited to occurring between the hours <br />of 7:00 a.m. and 5:00 p.m. Monday through Friday; <br />2. Water depth within a created waterbody (as applicable) shall not exceed <br />twelve (12) feet; <br />3. The provisions of section. 934.07(5)2 are satisfied, pertaining to the posting <br />of compliance and restoration bonds security, are satisfied; <br />4. The provisions of section 934.094 are satisfied, pertaining to the hauling of <br />excavated materials on public and private roads and the posting of road <br />maintenance security, are satisfied; <br />5. The provisions of section 934.0-56(1), are satisfied pertaining to littoral <br />zone and water management standards for created waterbodiest, are <br />satisfied; and <br />6. No dewatering occurs within one thousand (1,000) feet of any platted <br />subdivision that is not serviced by public water; <br />7. The project developer applies for and obtains an administrative site <br />plan approval for the transfer of material off-site. <br />7.(c) Large-scale transfer of excess material <br />Incidental to constructionmining activity on projects, including project phases, <br />over three hundred fifty (350) acres in size may be permitted for a total of up to <br />eighteen (18) continuous months from the date of commencement of off-site <br />hauling of excess material construction of the project's water management system, <br />if each of the following conditions is satisfied: as determined by the public works <br />director and the community development director: <br />• That a the project developer applies for and obtains site plan approval for the <br />transfer of material off-site. The site plan application is submitted for approval <br />shall which provides sufficient information to demonstrate compliance with all <br />applicable Chapter 934.04(7)(b) standards set forth above. <br />• That the quantity of excess fill produced by project construction and proposed to <br />be hauled off-site is the result of complying with water management or <br />Douhle Underline Text: Non Workshop Changes <br />Bold Underline: Additions to Ordinance <br />S-tfike—t-h-Fottglii Deleted Text from Existing Ordinance <br />F:ACommunity Development\Users \CurDevAORDINANCE \2008\2008- 934 Excavation(afterI2-19-08).RTE <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.