Laserfiche WebLink
RESTUDY OF INDIAN RIVER COUN'T'Y WATER AND SEWERAGE PROGRAM <br />3942—A <br />9-10-73 <br />Question Option No. 1 <br />Actions to be Taken <br />Should County proceed with a Purchase treated water from City of <br />1. <br />Establish the subareas within <br />CoCo <br />water supply program? Vero Beach for Region II - construct a <br />which water supply is to be <br />new treatment plant for Region I. <br />provided. <br />t� <br />2. <br />Decide whether fire protection is <br />fl <br />to be provided. <br />. m <br />3. <br />Decide > whether storage and <br />transmission facilities should be <br />sized in accord with the master <br />plan or should be reduced in size. <br />4. <br />Prepare layouts and cost estimates <br />for revised system. <br />5. <br />Determine method of project <br />funding; i.e., revenue and <br />assessment bonds, or revenue <br />bonds only. <br />6. <br />Obtain F.H.A. approval. <br />Option No. 2 <br />Actions to be Taken <br />Construct a new treatment plant for <br />1. <br />Same as for Option 1. <br />the area south of Vero Beach and a <br />new treatment plant for the area <br />... �._..a <br />north of Vero Beach and Region I. <br />Option No. 3 <br />Actions to be Taken <br />Purchase and renovate Mid-Florida <br />and UDU water systems only. <br />1. <br />Prepare layouts and cost estimates <br />for renovated systems. <br />Construct package treatment plants <br />')s <br />Determine method of project <br />for each system. <br />funding. <br />LLJ <br />3. <br />Obtain FHA approval. <br />Page 1 <br />