My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/10/1973
CBCC
>
Meetings
>
1970's
>
1973
>
10/10/1973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:26:53 AM
Creation date
6/10/2015 2:44:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/10/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT 101973 <br />M <br />Page -2- <br />cf' <br />(5) Install dual feeder systems for water stabilization and <br />corrosion control. <br />(6) Replace test sink and provide for common chemical water <br />test equipment for hardness, ph, iron, chlorine, and alkalinity. <br />(7) The preparation of an instruction manual, and instruction <br />of local personnel, for the proper utilization of the equipment and <br />operation of the facilities. <br />We have estimated and allocated approximately $35,000 as the <br />funding required to carry out this program. <br />Our tentative time schedule for this program would be as follows: - <br />2 to 4 weeks for preparation of final plans, specifications, <br />and approval submittals to the Division of Health. <br />2 to 4 weeks for approvals by the Division of Health. <br />14 to 16 weeks for longest delivery items of equipment.. <br />2 to 3 weeks for installation. <br />1 week for final inspection and approval by the Division of <br />Health. <br />Based upon this we would project a schedule of not less than <br />21 weeks nor more than 28 weeks as the total required time for completion <br />of this program. <br />Since the time of our last meeting we have made serious attempts <br />to meet and discuss the proposed plan with the Division of Health. To <br />date we have been unable to arrange this. We shall continue with our <br />efforts to arrange such a meeting. <br />We trust that this information covers fully any questions that were <br />unanswered. If we may be of any further assistance, please call on us. <br />We will be happy to help in any way possible. <br />Sincerely yours, <br />C. W. Wright, ce President.;�`� <br />Southeast Region <br />CWW:tp <br />cc: John D. Knoll Jr. - .elf^• ' 'J <br />cc: Mr. William M. Bostwick Jr., Regional Sanitary Engineer, <br />.Division of Healthpureau of Sanitary Engineering, 1350 Orange <br />Avenue, Winter Park, Fla. 32789 <br />--22 -- <br />e <br />��OK Q PA;E101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.