My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/1973
CBCC
>
Meetings
>
1970's
>
1973
>
12/5/1973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:26:53 AM
Creation date
6/10/2015 2:51:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/05/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />_ Boos 453 ;A;,i 7: 2 <br />OFFICIAL RECO' <br />for a water treatment plant. <br />(e) The necessary easements to provide a means of <br />ingress and egress to the property described in Exhibits B and C. <br />i (f) A sewer plant built to specifications approved by <br />County and other necessary governmental agencies, in a sufficient <br />capacity to meet requirements for capacity of the total project <br />known as Vista Royale. <br />(g) A water plant, as built to County specifications <br />and meeting requirements of other necessary governmental agencies <br />in sufficient capacity to meet the requirements for capacity of <br />the total -project known as Vista Royale. <br />(h) A water system which shall include the well fields, <br />mentioned above, pumps, manifold lines, treatment plant, storage <br />lines up to and including the meter for each building. Vista <br />shall retain ownership of the service lines from the buildings <br />to each meter. All meters on the Vista Ryale project shall be <br />provided and installed by Vista. <br />(i) A sewer .system which includes the sewer-plant <br />mentioned above, polishing pond located on Exhibit B, mains, <br />branch laterals, pumping stations and related appurtenances. Visi <br />shall retain ownership of all service lines to the buildings. <br />(j) Easements for utility.lines and supplementary <br />facilities to be dedicated as per, as built drawings. <br />2. County agrees at the time the permanent water and sewer <br />facilities at Vista are operating at the break-even point (i.e. <br />income equal to Vista's maintenance and operating costs, as <br />estimated to be when approximately 201 units are sold) to: <br />1. Accept the assets conveyed by this Agreement and <br />operate said water and sewer facilities as agreed herein; or, <br />2. Refuse to accept the conveyances of assets from <br />Vista as mentioned herein and refuse to operate the water and <br />sewer facilities. <br />In the event County elects Option 2, then County agrees to <br />(grant to Vista a water and sewer franchise and acknowledges <br />Therein that Vista has satisfied the necessary application require- <br />!II� -2- <br />l� <br />DEi197 <br />c3c�Jf <br />.r4DE�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.