My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/1973
CBCC
>
Meetings
>
1970's
>
1973
>
12/5/1973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:26:53 AM
Creation date
6/10/2015 2:51:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/05/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />r. <br />453 wa7 74 l <br />artesian wells to irrigate the golf course and other green areas. j <br />Said artesian wells and irrigation systems shall remain in the !� <br />ownership of Vista, with the right to use them for that purpose. <br />Vista specifically reserves (and the conveying documents shall so <br />state) that in the event the artesian wells can no longer provide <br />the capacity to water the golf course and irrigation system, <br />Vista specifically reserves the right to drill its own wells for <br />the purpose of irrigating the golf course. <br />6. As each stage of the water and sewer facilities are <br />completed, and ownership accepted by the County, County shall <br />operate said facilities in accord with standards promulgated by <br />County, State, and Federal Agencies. The parties agree that <br />governmental giiality standards for sewer and water may change. <br />and in that event, County shall promplty comply with the standards <br />as amended. County shall guarantee that the plants will be <br />operated to a quality control standard that. will insure Vista <br />the right to hook-ups assuming the capacity is sufficient accord- <br />ing to standard accepted engineering practices. All rate charges <br />for water and sewer will be in accord with the rates established <br />as set out in Exhibit H. County shall assume all costs of repair, <br />operation, and replacement for the facilities set out in paragraph <br />1, after they are conveyed to County. <br />7. The parties agree that there may be a considerable time <br />delay before the permanent water and sewer plants, as mentioned _ <br />herein, are constructed and in operation. In the interim, Vista <br />shall be allowed to own and operate, as agents for the County, <br />interim sewer and water plants constructed on property that will <br />not be conveyed to County. Said interim plants shall be built <br />Iin accordance with County Specifications and with the approval <br />of the County Engineer and other necessary governmental agencies. <br />8. To insure that Vista is guaranteed water and sewer <br />capacity in the facilities built and donated to the County to j <br />meet Vista's requirements, each of the conveying -documents shall <br />i <br />Il contain language guaranteeing rights to Vista of sufficient capacity <br />�to meet the total capacity requirements of the total project known <br />I� <br />-4- <br />UU. 51973 � o T8 312 <br />
The URL can be used to link to this page
Your browser does not support the video tag.