My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-025
CBCC
>
Ordinances
>
2000's
>
2002
>
2002-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2019 12:21:12 PM
Creation date
9/30/2015 3:46:05 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2002-025
Adopted Date
08/06/2002
Agenda Item Number
9.A.4.
Ordinance Type
Concurrency Management Requirements
State Filed Date
08\06\2002
Code Number
Section 910.02
Subject
Concurrency Determination
Codified or Exempt
Codified
Archived Roll/Disk#
2744
Supplemental fields
SmeadsoftID
839
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCENO* 2002= 025 <br />PD (planned development) rezoning or comprehensive plan amendment, the <br />concurrency impact assessment will be based on the following criteria: t -4e <br />maximum number- of units fer- Y-esidential land uses based upon the pr-oposed <br />o. r �. ,i , o designation, and the potential impaet equivalent to <br />eamme eial usage of ten thousand (10,000) square feet of gross t4aer- area per- aer-e <br />for- commer-eial, industrial land uses. will be used to assess impact-. <br />For Pro'ect's Intensity Measured B <br />Residential Conceptual Projects, or (Maximum number of SF or MF units allowed per <br />Residential Rezonings acre based upon the proposed zoning or land use <br />designation) X Total Property Acres <br />General Commercial or Office (10,000 sq. ft. of gross floor area per acre of retail <br />Conceptual Projects, commercial) X Total Property Acres <br />Comprehensive Plan Amendments <br />to CA without Rezoning, or <br />rezonings to PRO, OCR, MED, <br />CN, CL, CG <br />Heavy Commercial or Industrial (20,000 sq. ft. of gross floor area per acre ofeg neral <br />Conceptual Projects, or Rezonings industrial) X Total Property Acres <br />to CH,IL,IG <br />For conceptual project approval, the impact assessment will be based upon the development <br />parameters of the proposed project. No conceptual development order will be issued unless <br />the applicant has a valid conditional, or initial concurrency EletefminatioR certificate. <br />Conceptual development orders include:. <br />1. Comprehensive plan land use amendments; <br />2. Rezoning petitions; <br />I Conceptual project approvals; <br />(b) Initial development order. These are development orders which constitute project <br />approval and allow for submission of building permit applications or <br />commencement of development in relation to land development permits.; <br />however-, initial developm@nt or-Eler-s Ele not authorize issuanee of building pefmits" <br />for- nenstrunt;nn n ohanges of use wh;nh require n n , GO (nort;finnta ,f <br />oeoupaney-)-. No initial development order will be issued unless one of the <br />Coding: Words in strethrough type are deletions from existing law. Words underlined are additions 2 <br />4. Preliminary <br />plats <br />and preliminary PD <br />plans. <br />(b) Initial development order. These are development orders which constitute project <br />approval and allow for submission of building permit applications or <br />commencement of development in relation to land development permits.; <br />however-, initial developm@nt or-Eler-s Ele not authorize issuanee of building pefmits" <br />for- nenstrunt;nn n ohanges of use wh;nh require n n , GO (nort;finnta ,f <br />oeoupaney-)-. No initial development order will be issued unless one of the <br />Coding: Words in strethrough type are deletions from existing law. Words underlined are additions 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.