Laserfiche WebLink
That the tree is located where it interferes with the installation, delivery, or <br />maintenance of proposed or existing utility services to the site; <br />That the tree is diseased, injured, or in danger of falling; <br />7. That the tree is located on a portion of the site to be used for construction of <br />required parking areas or vehicular and pedestrian ingress and egress areas; <br />provided that, when this criterion is used to justify removal of a tree or trees <br />located within required yard setback areas, the applicant shall replace any such <br />tree or trees with an equal number of trees of similar ecological or aesthetic value, <br />as determined by the environmental planner, unless it can be demonstrated by the <br />applicant that the remaining site cannot be designed to accommodate and sustain <br />the substituted tree or trees. All replacement trees shall be of a minimum four (4) <br />inches diameter -at -breast -height (dbh); <br />That the tree is located on a portion of the site where structural development is <br />proposed, provided reasonable effort has been made to preserve protected trees <br />and specimen trees to the extent feasible under this criterion. <br />(b) Land -clearing permit. No land -clearing permit shall be issued unless the environmental <br />planner finds that each of the following criteria has been satisfied: <br />That the land clearing or grubbing is necessary in order to make site <br />improvements, authorized by an approved site plan, subdivision approval, <br />building permit, or land development permit, and that the area to be cleared is the <br />minimum necessary for such work or, in the event the aforementioned approvals <br />are not required by law for the intended use of the property, that the proposed <br />clearing is the minimum necessary for the proposed use or improvement. Land <br />clearing or grubbing of a site associated with a proposed development plan (e.g., <br />site plan or subdivision preliminary plat) shall not be allowed to occur prior to <br />county approval of the applicable development plan, except as specifically exempt <br />in section 927.06. <br />2. That the applicant has provided a reasonable, written plan to control erosion <br />which may be expected to occur as a result of the proposed clearing or grubbing. <br />The plan shall incorporate some or all of the following means as determined by <br />the applicant: temporary seeding and mulching, sodding, diversion berms, <br />interceptor ditches, sediment barriers, sediment basins, and related appurtenances <br />or devices. All provisions of an erosion control plan shall be incorporated as <br />express conditions of the land -clearing permit issued and a violation of the <br />conditions or provisions of the plan shall be considered a violation of this chapter <br />and subject to all enforcement provisions. Environmental planning staff may <br />request written elaboration of a proposed plan prior to issuance of a permit in <br />order to clarify the nature and design of measures intended by the applicant. <br />District (SJRWMD) <br />approval or exemption regarding <br />the proposed land clearing <br />ORDINANCE <br />NO. <br />2002-030 <br />That the tree is located where it interferes with the installation, delivery, or <br />maintenance of proposed or existing utility services to the site; <br />That the tree is diseased, injured, or in danger of falling; <br />7. That the tree is located on a portion of the site to be used for construction of <br />required parking areas or vehicular and pedestrian ingress and egress areas; <br />provided that, when this criterion is used to justify removal of a tree or trees <br />located within required yard setback areas, the applicant shall replace any such <br />tree or trees with an equal number of trees of similar ecological or aesthetic value, <br />as determined by the environmental planner, unless it can be demonstrated by the <br />applicant that the remaining site cannot be designed to accommodate and sustain <br />the substituted tree or trees. All replacement trees shall be of a minimum four (4) <br />inches diameter -at -breast -height (dbh); <br />That the tree is located on a portion of the site where structural development is <br />proposed, provided reasonable effort has been made to preserve protected trees <br />and specimen trees to the extent feasible under this criterion. <br />(b) Land -clearing permit. No land -clearing permit shall be issued unless the environmental <br />planner finds that each of the following criteria has been satisfied: <br />That the land clearing or grubbing is necessary in order to make site <br />improvements, authorized by an approved site plan, subdivision approval, <br />building permit, or land development permit, and that the area to be cleared is the <br />minimum necessary for such work or, in the event the aforementioned approvals <br />are not required by law for the intended use of the property, that the proposed <br />clearing is the minimum necessary for the proposed use or improvement. Land <br />clearing or grubbing of a site associated with a proposed development plan (e.g., <br />site plan or subdivision preliminary plat) shall not be allowed to occur prior to <br />county approval of the applicable development plan, except as specifically exempt <br />in section 927.06. <br />2. That the applicant has provided a reasonable, written plan to control erosion <br />which may be expected to occur as a result of the proposed clearing or grubbing. <br />The plan shall incorporate some or all of the following means as determined by <br />the applicant: temporary seeding and mulching, sodding, diversion berms, <br />interceptor ditches, sediment barriers, sediment basins, and related appurtenances <br />or devices. All provisions of an erosion control plan shall be incorporated as <br />express conditions of the land -clearing permit issued and a violation of the <br />conditions or provisions of the plan shall be considered a violation of this chapter <br />and subject to all enforcement provisions. Environmental planning staff may <br />request written elaboration of a proposed plan prior to issuance of a permit in <br />order to clarify the nature and design of measures intended by the applicant. <br />Coding: Words in ^`��,rRe MFOugh are deletions from existing law. Words underlined are additions. <br />District (SJRWMD) <br />approval or exemption regarding <br />the proposed land clearing <br />or grubbing activity. <br />Coding: Words in ^`��,rRe MFOugh are deletions from existing law. Words underlined are additions. <br />