My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-055
CBCC
>
Resolutions
>
1980'S
>
1987
>
1987-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 12:23:30 PM
Creation date
9/30/2015 5:08:47 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1987-055
Approved Date
06/16/1987
Resolution Type
Sanitary Sewer
Entity Name
Camp dresser & McKee
Florida Department of Environmental Regulation
Subject
Engineering study for Rockridge sewer improvements
Area
Rockridge
Supplemental fields
SmeadsoftID
2533
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' <br />of Indian River County. <br />implement this recommendation, it is suggested that <br />In order to <br />' <br />the Indian River County Commission hold a series of public meetings <br />with the Rockridge area residents in order to present this report and <br />the general approval of the residents directly affected to proceed <br />secure <br />with the recommended alternative. The County Commission should also <br />make the decision makers in Vero Beach aware of the contents in this <br />report in order to refine the mechanics of how and where the collected <br />wastewater from the Rockridge project can be discharged into the existing <br />' <br />Vero Beach system for treatment at the Vero Beach plant. <br />directly affected residents of the Rockridge area, <br />As soon as the <br />the City of Vero Beach and the Indian River County Commission are satis- <br />fied and the project's general scope of work is fairly well-defined, <br />detailed engineering design can be done and the project constructed. <br />It is estimated that the individual house grinder pump and small force <br />alternative design can be engineered and constructed in <br />main system <br />' <br />approximately 1 year. <br />1 <br />11 <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.