Laserfiche WebLink
7 <br />J� <br />IRE ENGINEERING & TESTING INC.MP G C <br />P.O. Box 776 Telephone <br />Vero Beach, Florida 32960 305.569-0153 <br />' Masteller & Moler Associates, Inc. <br />Rockridge Wastewater Collection System <br />March 24, 1986 <br />Conclusion <br />In the construction of a Gravity Collection System, in this <br />area, the following items should be taken into <br />consideration: <br />1. De—watering will be needed. <br />' 2. Hard Limestone will have to be excavated. <br />t3. Existing utilities. <br />' 4. Existing easement is 10' wide. <br />5. The Hard Limestone encountered at each boring <br />' location covers the entire project, at varying <br />depths and thicknesses. <br />' If you have any questions, concerning this matter, please <br />call the office. <br />' Sincerely, <br />JIn <br />v <br />�1 <br />' Harry 0. Wagne, P. E. <br />' HOW/mw <br />