My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-055
CBCC
>
Resolutions
>
1980'S
>
1987
>
1987-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 12:23:30 PM
Creation date
9/30/2015 5:08:47 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1987-055
Approved Date
06/16/1987
Resolution Type
Sanitary Sewer
Entity Name
Camp dresser & McKee
Florida Department of Environmental Regulation
Subject
Engineering study for Rockridge sewer improvements
Area
Rockridge
Supplemental fields
SmeadsoftID
2533
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i7 <br />P, <br />t <br />n, <br />i <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />R <br />a <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />�.9 <br />approximately 515. <br />The proposed project would remove a probable <br />source of contamination by eliminating septic tank effluent, <br />thus improving the surface water and ground water in and <br />around the study area. However, during construction traffic <br />flow may he restricted and noise and air ouality problems <br />may he encoiinterec rluc to diming etiring construction. <br />These r.roblems would be mitigated as much as possible. Yo <br />long term negative environmental effects would he created by <br />the proposed proiect. <br />The estimated cost to individual property owners <br />based upon the preliminary project costs would he as much as <br />$5,112 without gran -t funding to as little as X2,300 with <br />grant funding. The actual cost to each property owner would <br />depend on the amount of funding available and the actual <br />project cost at the time of the construction. The cost to <br />each property owner would be a one-time fee. However, since <br />it is not a small one-time fee, it could be paid off over a <br />five to ten year period depending on the funding mechanisms <br />available to the County at the time of construction. In <br />addition, each property owner would ?be required to pay a one- <br />time imnact fee to the bounty in the amount of $1,250. <br />Thank you. <br />VP. *`TTrTVSCAARn; Thank you, Frian. <br />I would like to make one minor qualification, make <br />ZAYBATARO f ASSOCIATES <br />A Computer Assisted Transcript <br />(305)569-0410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.