Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />1.3 <br />14 <br />15 <br />1.6 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />20 <br />YP- <br />r'P. FRATIS: <br />Actually that <br />would apply to either <br />place, <br />wherever you put <br />it, road or <br />in the hack. <br />going to cost. <br />MR. GRAHAM: <br />('orrect, for <br />the gravity sewer, <br />that's <br />correct. <br />50 thousand dollars. For the recommended <br />grinder pump <br />system, construction cost, one million seven <br />YR. FP.AILS: <br />okay. Po you <br />have a total for the <br />gravity <br />system on ii+at <br />it would cost <br />and also on the pump <br />syster , <br />YP- <br />GPAPPf: Yes, sir, T do, 'no you want present <br />worth cost or constructior. cost? <br />MP. <br />FRAILS: Well, I'd like to have both, what the <br />whole system <br />over there is going to cost and what each <br />individual is <br />going to cost. <br />VR. <br />GRANA-": To construct the gravity, <br />conventional <br />gravity sewers, construction cost, tv,o million <br />eight hundred <br />50 thousand dollars. For the recommended <br />grinder pump <br />system, construction cost, one million seven <br />hundred 20 thousand dollars. <br />MP. <br />FRAILS: NTow, can you tell me what size pumps <br />are going in? <br />MR. <br />GRAHAM Yes, sir. The e?rinder numnc ern +•.,- <br />horsepower. <br />'N?. FRAILS: Two horse. <br />;"R. GRAI'AM: Two, two and a half, depending, <br />again, on final desien. Two horsepower. They would pump at <br />approximately two hundred gallons per minute. <br />ZAMPATARO f ASSnrIATFS <br />A computer Assisted Transcript <br />(305)569-0910 <br />