Laserfiche WebLink
n <br />1 <br />[i <br />7 <br />1 <br />1 <br />4 <br />5 <br />6 <br />7 <br />8 <br />n <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />to <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />41 <br />afterwards, I'll get You a business card and get vour name <br />and we'll get it to you. M'e're figuring around thirty feet <br />a head is where the operating point is. So that's a very <br />low pressure system. <br />NR. FRAII.S: Are there any master pumps in between <br />on this or is this directly into the watershed, into the <br />retriever? Fllich one is it^ <br />Tei'. A'TIYVSrAARP: Well, t`eat's a question that's <br />going to be answered in final design. I don't mean to put <br />you off on that, but there's a couple different scenarios <br />here to play out, and that is where is the waste -water going <br />to go. If it goes to the City of Vero Beach Waste Water <br />Treatment Plant as previously planned for right now in our <br />report, it probably will not have to be pumped 'because that <br />treatment Plant is located right next to the Indian River. <br />So it's very close. The header head that has to be placed <br />in the system can probably achieve that. <br />That all has to be modeled and that's part of <br />final design and that's tasked for another day down the <br />road. But on a planning level hasis, it appears to have the <br />chance of being successful without having to have another <br />pump station. If you go to another facility, though, that's <br />not the City of Fero Peach. And right now it's not <br />concepted to change that. <br />MR. FRAILS: Wbat size reservoir is the tank we're <br />ZANTBATARO 6 ASSCrIATFS <br />A computer Assisted Transcript <br />�305)56�-nQln <br />