My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-055
CBCC
>
Resolutions
>
1980'S
>
1987
>
1987-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 12:23:30 PM
Creation date
9/30/2015 5:08:47 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1987-055
Approved Date
06/16/1987
Resolution Type
Sanitary Sewer
Entity Name
Camp dresser & McKee
Florida Department of Environmental Regulation
Subject
Engineering study for Rockridge sewer improvements
Area
Rockridge
Supplemental fields
SmeadsoftID
2533
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />l <br />' <br />CONTENTS <br />(Continued) <br />5.0 <br />FUTURE CONDITIONS <br />' <br />5.1 Future Land Use <br />5-1 <br />5.2 Future Population Projections <br />5-1 <br />' <br />5.3 Forecast of Wastewater Flows <br />5.4 "Two Rule" Evaluation <br />5-2 <br />-Thirds <br />5-2 <br />6.0 <br />ALTERNATIVE WASTEWATER COLLECTION SYSTEMS <br />6.1 General <br />6-1 <br />6.2 Alternative Systems <br />6-1 <br />6.2.1 Small Diameter Sewers <br />6-1 <br />' <br />6.2.2 Vacuum Sewers <br />6-1 <br />6.2.3 Pressure Sewers <br />6-2 <br />' <br />6.2.4 No -Action Alternative <br />6.3 Cost -Effectiveness Analysis <br />6-2 <br />6-3 <br />7.0 <br />PUBLIC PARTICIPATION <br />7.1 General <br />7-1 <br />7.2 Public Hearing <br />7-1 <br />7.3 Public Survey <br />7-4 <br />' <br />7.4 Future Public Participation <br />7-4 <br />8.0 <br />PRELIMINARY DESIGN <br />' <br />8.1 General <br />8-1 <br />8.2 Design Criteria <br />8-1 <br />' <br />8.2.1 Wastewater Flows <br />8-1 <br />8.2.2 Design Layout <br />8-1 <br />8.3 Time Schedule <br />8-5 <br />' <br />8.4 Cost Estimate <br />8.4.1 Construction Costs <br />8-8 <br />8-8 <br />8.4.2 Estimated Cost of Project to Homeowner <br />8-8 <br />' <br />9.0 <br />ARRANGEMENTS FOR IMPLEMENTATION <br />9-1 <br />10.0 <br />SUMMARY OF ENVIRONMENTAL CONSIDERATIONS <br />' <br />10.1 General <br />10-1 <br />10.2 Environment <br />10-1 <br />' <br />10.2.1 Water <br />10.2.2 Air <br />10-1 <br />10-2 <br />10.2.3 Land Use <br />10-2 <br />10.3 Construction <br />10-3 <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.