My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-055
CBCC
>
Resolutions
>
1980'S
>
1987
>
1987-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 12:23:30 PM
Creation date
9/30/2015 5:08:47 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1987-055
Approved Date
06/16/1987
Resolution Type
Sanitary Sewer
Entity Name
Camp dresser & McKee
Florida Department of Environmental Regulation
Subject
Engineering study for Rockridge sewer improvements
Area
Rockridge
Supplemental fields
SmeadsoftID
2533
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />iL <br />11 <br />1 <br />1 <br />C <br />L <br />F <br />A lengthy question -and -answer period followed the presentation, during <br />which doubts were raised concerning the need for sewers and for the study <br />in general. Many were concerned that funding would not be available and <br />that they would be assessed an amount that they could not afford. A <br />transcript of the entire meeting is presented in Appendix C. <br />7.3 PUBLIC SURVEY <br />A septic tank survey was distributed at the public hearing and can be found <br />on Figure 7-3. Of the 124 people responding, 65 were against the project, <br />regardless of the funding situation. Forty-six people were in favor of the <br />project, only if substantial outside funding became available. Thirteen <br />individuals were in favor of the project, regardless of the funding <br />situation. It should be noted that only 29 percent of the households <br />affected responded to the survey. <br />7.4 FUTURE PUBLIC PARTICIPATION <br />' The County Commission could decide that the project is in the best interest <br />of the community, in which case the County will continue with the program. <br />' However, there is a possibility that funds may not be available after the <br />system is designed. At that point, the County could fund the project <br />itself, or keep the drawings and specifications ready until construction <br />' grant funds became available. <br />' The Commission could also decide to stop the project at this point. The <br />County could use the information gathered in this study for other purposes <br />' now. In the future, circumstances could change such that there is more <br />support for a sewer project. In that case, the preliminary studies will <br />' have already been done, and the project can proceed right into design and <br />construction. <br />' Commission meetings concerning this project will be open to the public. <br />This will allow another opportunity for the public to participate in the <br />decision-making process. <br />' IRC.VB4 <br />6/4/87 <br />7-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.