Laserfiche WebLink
1 <br />TABLE 8-3 <br />' ESTIMATED COST OF PROJECT TO INDIVIDUAL PROPERTY OWNER <br />post to <br />Total Project Eligibility(2) Project Cost Property Owner <br />Item Cost Factor with Funding with 55% Funding <br />Grinder Pump <br />$948,637 <br />eptic Tank <br />$2,248 <br />Conversion <br />105,500 <br />VC Force Main <br />91,975 <br />lean Out and Air <br />43,918 <br />Release Valves <br />316,500 <br />ervice Connections <br />105,500 <br />Wet Tap to Existing <br />750 <br />Force Mains <br />3,000 <br />lectrical Cable <br />37,980 <br />Electric Outlet <br />21,100 <br />scellaneous <br />7 <br />fiavement Repair, <br />18,135 <br />Special Foundations <br />90 <br />Technical Services <br />711,485 <br />24 <br />50 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />ost to Proper <br />Owner without <br />55% Funding <br />0.95 <br />$452,974 <br />$1,073 <br />$2,248 <br />0.95 <br />50,376 <br />119 <br />250 <br />0.95 <br />43,918 <br />104 <br />218 <br />0.95 <br />151,129 <br />358 <br />750 <br />0.95 <br />50,376 <br />119 <br />250 <br />0.95 <br />1,433 <br />3 <br />7 <br />0.95 <br />18,135 <br />43 <br />90 <br />0.95 <br />10,075 <br />24 <br />50 <br />0.95 339,734 805 1,686 <br />$2,650 $5,549 <br />