Laserfiche WebLink
1 Project Description: <br />Use additional sheets as necessary to respond to the following: <br />(a) What type of work is being proposed? (check all that apply) <br />❑ Planning activities <br />❑ Project development and Environmental Studies <br />® Engineering and Final Plans Preparation Work. <br />❑ Right of Way .acquisition. <br />® Construction. <br />® Construction Engineering and Inspection Activities. <br />P.9. 2 of 3 <br />(b) Describe how the proposed project relates to surface transportation such. as by function, proximity or <br />impact. (One or more may apply). <br />(c) Where is the project located (and what are the termini, if appropriate)? Include location map. <br />(d) Summarize any special characteristics of project. Provide typical section drawings for appropriate projects. <br />(e) Describe the Project's existing right of way ownerships. This description shall identify when the right of way <br />way was acquired and how ownership is documented (i.e. plats, deeds, prescriptions, certified surveys). <br />(fl Describe arty proposed r!ght of way acquisition, including expected matching fund source, limitations or <br />fund use or availability, and who will acquire and retain ownership of proposed right of way. <br />(g) Describe any related project work phases that are already complete or currently underway. <br />(h) Other specific project information that should be considered. <br />I Project Implementation Information: <br />Attach documentation as exhibits to this application. <br />(a) Describe the proposed method of performing (i.e. contract or in-house) and administering (i.e. local or <br />State) each work phase of the project. If it is proposed that the project be administered by a governmental <br />entity other than the Department of Transportation, document that this entity has the fiscal, managerial, <br />environmental and engineering_ capabilities to manage the work phase of the project consistent with federal <br />requirements. <br />(b) Describe any public (and private, if applicable) support of the proposed project. (Examples include: <br />written endorsement, formal declaration, resolution, financial donations or other appropriate means) <br />(c) Describe the proposed ownership and maintenance responsibilities for the project when it is completed, <br />(d) Describe source of matching funds and any restrictions on availability. <br />(e) Other specific implementation information that should be considered. <br />