My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-189
CBCC
>
Resolutions
>
2000's
>
2006
>
2006-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2015 6:05:53 AM
Creation date
9/30/2015 4:44:03 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2006-189
Approved Date
12/12/2006
Agenda Item Number
No data from migration
Archived Roll/Disk#
3129
Supplemental fields
SmeadsoftID
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 - WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> Widening of Oslo Road to a 5-lane Roadway from West of Old Dixie Highway <br /> to 27 n Avenue including construction of Stormwater Facilities and Sub-Lateral <br /> Canal Enclosure <br /> ARTICLE 2 - THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: Oslo Road (CR 606) Phase I Roadway Widening <br /> County Project Number: 9705C <br /> Project Address: Oslo Road (CR 606) from West of Old Dixie Highway to 27th Avenue <br /> ARTICLE 3 — ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have the <br /> rights and authority assigned to ENGINEER in the Contract Documents in connection with the <br /> completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 365 calendar day after the date <br /> when the Contract Times commence to run as provided in paragraph 2.03 of the General <br /> Conditions, and completed and ready for final payment in accordance with paragraph <br /> 14.07 of the General Conditions on or before the 425 calendar day after the date when the <br /> Contract Times commence to run. <br /> 00520-Agreement(Public Works)2006091 <br /> 00520-2 <br /> FAPubllc Works\Caplial Projecls\0slo Road\Oslo Road-Old Dixle to 27th Ave\CONTRACT DOCUMENT\00520-Agreement(Public Works)2006091.doc Rev.05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.