Laserfiche WebLink
Comprehensive Plan <br />Capital Improvements Element <br />Table 6.16: Service Level Measures for Concurrency Related Facilities <br />Public Facility Category <br />Specific Facility <br />Capacity Measure <br />Demand Measure <br />Geographic Scope <br />Trans ortation <br />p <br />RoadwayVolume <br />of cars <br />accommodated over time <br />Peak Season/Peak <br />Direction/Peak Hour Trips <br />Affected Roadways <br />Sanitary Sewer <br />Treatment Plant <br />(GPD) Treatment design Capacity <br />Generation Rate (GPD) <br />Service Area <br />Potable Water <br />Treatment Plant <br />(GPD) Treatment Design Capacity <br />Generation Rate (GPD) <br />Service Area <br />Solid Waste <br />Landfill <br />Volume in active cell (cubic <br />yards) <br />Generation Rate (tons per <br />capita per year) <br />Entire County <br />Recreation <br />Parks <br />Acres of park land <br />Acres of parks per thousand <br />population <br />Entire County <br />Stormwater Management <br />Drainage <br />conveyances <br />Volume of water <br />Volume of stormwater <br />outfalling for design storm <br />Basin <br />Education* <br />Public Schools (K- <br />Number of Children <br />Enrolled Students! Future <br />•Service Area <br />12) <br />acc.ommod...ated over time <br />Student Generation <br />*Limited to participating Schools owned and operated by the Indian River CountySchool District <br />Concurrency requires that each facility within the geographic scope of a proposed project's impact <br />area have sufficient capacity to accommodate the project's demand. If that capacity is not available, <br />the project cannot be approved. The principal function of the concurrency management system then is <br />to provide a mechanism whereby demand and capacity measures can be compared on a project by <br />project basis. <br />Table 6.16 provides the criteria for establishing a demand to capacity comparison for a proposed <br />project. While most of the characteristics are self-explanatory, one needs clarification; this is the <br />geographic scope for the traffic public facility category. For concurrency purposes, affected roadways <br />will be those roadways impacted by a project's traffic. All projects, regardless of size, impact the <br />roadway on which the project fronts. In addition, other roadways further removed from the project <br />are impacted. For concurrency purposes, roadways that gain 5% or more of the project's traffic or 50 <br />or more of the project's generated trips, whichever is less are included. Level -of -service standards for <br />concurrency related facilities are to apply to all requests for development orders and permits. Level - <br />of -service standards are measurements based on peak -hour trips and based on volume ranges or <br />average travel speed for the peak hour. <br />Demand <br />Demand is an important component of the concurrency management system. Essentially, demand is a <br />measure of facility use. When compared to facility capacity, demand can indicate the level -of -service <br />for the facility. <br />Community Development Department Indian River County <br />43 <br />