My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-047
CBCC
>
Resolutions
>
2000's
>
2007
>
2007-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 11:20:35 AM
Creation date
9/30/2015 4:47:09 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2007-047
Approved Date
05/08/2007
Agenda Item Number
9.A.5
Resolution Type
Amendment
Entity Name
Florida Department of Community Affairs
Subject
Amendments to Capital Improvements Element
Text Intergovernmental Coordination Element
Public Schools Facilities Element
Archived Roll/Disk#
3129
Supplemental fields
SmeadsoftID
2096
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />➢ School Concurrency (School. Service Area): <br />• 100 percent of:Florida Inventory of School Houses (FISH) capacity for each public school <br />type (elementary, middle, and high). <br />➢ Solid Waste (Countywide) <br />• 2.2 tons per capita per year or 3.67 cubic yards per capita for permanent plus weighted <br />peak seasonal population per year <br />➢ Stormwater Management <br />• New drainage systems shall mitigate the impacts of a 25 year/24 hour design rainfall <br />event <br />• Minimum road crown elevation for existing roads shall be raised during <br />resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm <br />event on local roads <br />• The center two lanes of rebuilt roads must be at or above flood levels resulting from a <br />10 year/24 hour storm event on Arterial and Collector roads <br />• All drainage basins will meet the following level -of -service standards: <br />• By 2000 - 2 year/24 hour storm event <br />• By 2005 - 5 year/24 hour storm event <br />• By 2010 - 10 year/24 hour storm event <br />➢ Transportation (Roadways) <br />• Level -of -Service "D" during peak hour, peak season, and peak direction conditions on <br />all TRIP grant funded roads as well as all freeway, arterial, and collector roadways, <br />with the exception of the following two, which will operate at level of service "E" <br />plus 20%: <br />• 27th Ave — South County Line to SR 60 <br />• 43`d Ave - Oslo Road to 16th Street <br />For SIS/Florida Intrastate Highway System roadways, level of service "B" is adopted <br />for rural areas, and level of service "C" is adopted for urban areas. <br />➢ Transit <br />• One-hour headways shall be maintained on all fixed transit routes <br />Level -of -service standards are discussed in further detail in each individual Comprehensive Plan <br />Element. <br />Capital Improvements Program <br />A capital improvements program (CIP) is a program for capital expenditures to be incurred each year <br />over a fixed period of years to meet anticipated capital needs. This program identifies projects that <br />Community Development Department Indian River County <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.