My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/11/1974 (2)
CBCC
>
Meetings
>
1970's
>
1974
>
9/11/1974 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:27:29 AM
Creation date
6/10/2015 3:36:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/11/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />Unit price per ton on approximately 500 tons or Type II Asphaltic <br />Concrete Surface Course Material in accordance with Florida State <br />Department of Transportation specifications, delivered F.O.B. <br />Vero Beach in various quantities and at various times as.needed. <br />2. <br />Unit price per ton, for approximately 5000 tons, for hauling, <br />spreading by an approved mechanical spreader, and finishing Type <br />II Asphaltic Concrete Surface Course Material, all in accordance <br />with Florida State Department of Transpoxtation specifications. <br />3. <br />Unit price per foot on approximately 2,000 linear feet of 12 pound <br />pressure treated creosote southern.pine lumber. Price to be for <br />truck load lots of approximately 1,000 linear feet delivered to <br />County Garage. Piling to have a minimum 12" diameter at butt and <br />8" diameter at tip in accordance with Florida State Department of <br />Transportar,ion :•pe::ifications. Bid prices should be made on piling <br />' <br />lengths of 20 feet; 25 feet; 30 feet and 35 feet. <br />4. <br />Unit price per 1,000 board feet on approximately 7,000 board feet <br />of 12 pound pressure treated creosote southern pine lumber in <br />approximately 7,000 board feet truck load lots delivered to the <br />County Garage for sizes as follows: <br />A. 12" X 12" X 26' length F. 4" X 8" X 12' length <br />" <br />B. 3"X10"X28' G. 3"X8"X16' " <br />C. 4" X 8" X 14' H. 4" X 10" X 16' " <br />D. 12" X 12" X 22' ItI. 10" X 10" X 16' " <br />S. <br />Unit price per ton on approximately 150 tons of pit run, Miami <br />Oolite, Ocala, or Naranga type road rock meeting Florida State <br />Department of Transportation specifications. Price F.O.B. Vero <br />Beach, Florida. <br />6. <br />Unit price per foot bid on asphalt coated corregated metal pipe <br />for any available gauge for approximately 800 linear feet depend- <br />ing upon the County's _requir6nents. Sizes, ranging from 10" dia- <br />meter to 96" diameter. Delivered to the County Garage. <br />7.. <br />Unit price per foot bid on aluminum metal pipe for any available <br />gauge for the County's requirements ranging in sizes from 10" <br />diameter to 96" diameter delivered to the County Garage. <br />S. <br />Unit price bid on "0" Ring Rubber and/or Neoprene Concrete pipe <br />for any available gauge for approximately 200 linear feet depend- <br />ing upon the County's requirements. Sizes ranging from 10" diameter <br />to 72' diameter. Delivered to the County Garage. <br />SEP 25 1974 <br />9. Approximately 185,000 gallons of hi -test gasoline, 12,000 <br />gallons of."No Lead" hi -test gasoline and approximately <br />65,000 gallons of diesel fuel all in accordance with the <br />specifications and bid proposal forms available at the office <br />of the County Administrator, Room 115, Court House, Vero Beach, <br />Florida. <br />10. Unit price per yard for approximately 300 yards of 3,000 pound <br />ready -mix concrete for the pouring of bridge slabs at the <br />County Garage. Also unit price per yard for approximately <br />100 yards of 2,500 pound readymix concrete delivered in as <br />little as one yard quantities for miscellaneous pours at <br />various points in the County for bridges, headwalls and curbs. <br />BOOK 6 >'A t 418 <br />
The URL can be used to link to this page
Your browser does not support the video tag.