Laserfiche WebLink
IRC Fee Schedule December 2006 <br />2. Application Modification review fee - $100 for 15t and 2d re -reviews. <br />$600 each for third and subsequent reviews.* <br />{ *per state statute when content fails to meet Sufficiency Requirement Check List} <br />3. Permit/Plan Revision or Pre -application Design Review - Sioo <br />C. After the fact Permit Double Fees* <br />(Retroactive Permitting after Construction Start) * Statutory <br />II. TRADES PERMIT APPLICATION FEE <br />$75 <br />Minimum application fee up to $18,000 valuation, then 0.415% of contract/work order <br />valuation. Fee due at time of application. After -the -fact permits double fees. Any <br />combination of trades work for which the aggregate contract/work order value exceeds <br />$1,000 must have a permit. <br />Burglar Alarm * Irrigation System * <br />Insulation * Fuel Gas * <br />Electric * Mechanical * <br />Electrical Addition/Alteration * Residential Paving* (Driveway, Patio) Slab <br />Electrical Service Change * Plumbing * <br />Electrical Temporary Pole * In -fill Screening * <br />Solar*(any use) Pool Barrier* (other than screened enclosure) <br />Prefabricated Detached Accessory Structure <br />(Fire Alarm System and Fire Suppression Systems will be permitted through Fire Department <br />and not through Building Permit Fees.) <br />Items marked thus (*) when included on the building permit documents and provided <br />with subcontractor affidavits at time of permit are included in the building permit fee. <br />Greater of TRADE FEE or Valuation Fee Applies Valuation, Not Fixed <br />A copy of the contract, Notice of Commencement, Permit Application or work order that provides a <br />detailed scope of work acceptable to the Building Official, location, owner, and value of the work, signed <br />by both the Owner of record and a representative of the Contractor of record is required to be provided <br />at application. <br />III. SPECIAL PERMITS APPLICATION FEE $200 <br />Minimum application fee up to $48,000 valuation, then 0.415% of contract/work order <br />valuation. After -the -fact permits double fees. Any combination of work for which the <br />aggregate construction value exceeds $1,000 must have a permit. <br />Miscellaneous Permits $225 {Example: Fixed Station Generator, Commercial <br />paving, etc.} <br />Re -roofing $225 <br />Swimming Pool, Residential and Commercial $225 <br />Page 2 of 3 <br />Appendix A <br />