My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/5/1975
CBCC
>
Meetings
>
1970's
>
1975
>
3/5/1975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 10:16:23 AM
Creation date
6/10/2015 3:42:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/05/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.. The sub -grade width shall be two feet wider -than <br />the base course with the exception that the sub - <br />grade width shall be such as to include the curb <br />and gutter sections when they are to be constructed. <br />Approval of sub -grade shall be obtained before the <br />base course is begun. <br />D. Base Course: <br />1. Lime Rock Base or. Cemented Coquina Material <br />The material used shall conform with the require- <br />ments specified in the D.O.T. Standard Specifica- <br />tions for Road and Bridge Construction under <br />Section 503 approved and adopted Anril 1, 1973, <br />subject to supplements and new nublications as, <br />issued, approved and adopted by the D.O.T. <br />No forms shall be required unless specified. <br />The lime rock shall be transported and dumped by <br />approved methods. <br />The lime rock shall be spread uniformly with equip- <br />ment approved by the engineer. <br />All segregated areas of lime or course rock shall <br />be removed and replaced with well -graded rock. <br />After spreading is completed, the entire surface <br />shall be scarified and shaped so as to nroduce the <br />exact grade and cross-section after compaction. <br />When the material does not have the proper moisture' <br />content to insure the required density, wetting or <br />drying will be required. As soon as proper condi- <br />tions of moisture are attained the material shall. <br />be compacted to the satisfaction of the Engineer <br />and/or to an average density of at least 95% of <br />the maximum density obtainable A.A.S.H.O. Method <br />T99, modified at optimum moisture. <br />Unless otherwise directed by the engineer, the. <br />surface shall be "hardnlaned" with a blade grader <br />immediately prior to the application of the prime <br />coat, to remove the thin -glazed or cemented surface <br />of the base. If at any time the sub -grade material <br />should become mixed with the base -course material, <br />the contractor shall, without additional compen- <br />sation, dig out and remove the mixture, reshape:• <br />and compact the sub -grade and replace the materials <br />.removed with clean base material, which shall be <br />shapedand compacted as specified above. .If cracks <br />or checks appear in the base, either before or after <br />priming, which, in the opinion of the engineer, <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.