My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/5/1975
CBCC
>
Meetings
>
1970's
>
1975
>
3/5/1975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 10:16:23 AM
Creation date
6/10/2015 3:42:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/05/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. The construction and completion in a finished condition <br />of all drainage and drainage structures in accordance <br />with the specifications of the County which are as <br />follows: <br />1. "A11 areas on both sides of all paved and curbed <br />areas of all streets extending from the pavement <br />to the property line shall be seeded, sprigged or <br />sodded as provided for in Section 570 of D.O.T. <br />Specification. <br />Note: See Appendix Figure 6 on page 34. <br />2. All driveways leading from the travelway portion of <br />any roadway shall be paved or surfaced, conforming <br />to the drainage swale profile or drainage pipe of <br />sufficient size which shall be placed underneath <br />each driveway in the drainage swale to permit proper <br />drainage. The minimum size of drainage pipe in a <br />roadway Swale shall be 12 (twelve) i.aches. <br />3. "All concrete gutter sections shall make provision <br />for intersecting with other drainage facilities <br />with concrete outlets and changes in typical sec- <br />tions to assure drainage from the gutter. Culverts <br />under roadways shall have rip rap or concrete head- <br />walls where deemed necessary by the Engineer & <br />County Administrator. <br />4. All back lot drainage ditches shall be dug to a <br />minimum of a three to one side slope. Unless other- <br />wise designated by the Engineer. <br />5. Headwalls, shall be as follows: <br />6. The mixture shall be in a proportion .of 1 <br />of cement to 5 cubic feet of clean sand. - <br />mixture is to be placed in approved, -tied <br />Between such layer. of bags there is to be <br />cement mixture as described above. <br />7. For heights of headwalls up to six feet -a <br />inch to one foot batter shall be made. <br />cubic foot <br />This <br />cloth bags. <br />a sand <br />one eighth <br />8. For heights between 6 feet and 12 feet, the footing <br />shall be 3 bags wide, gradually decreasing the <br />number to a one bag width at the top. <br />-11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.