My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/5/1975
CBCC
>
Meetings
>
1970's
>
1975
>
3/5/1975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 10:16:23 AM
Creation date
6/10/2015 3:42:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/05/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
six inch mains and shall be so positioned throughout <br />the area that the hydrant shall provide coverage <br />for an area within a five -hundred foot radius. <br />Entire subdivisioncoverage made. National Fire <br />Underwriters code shall be complied with as to <br />pressure and quantity. <br />7. Seweragetreatment plant when ,required shall be <br />located a minimum distance of 100' (feet) from the,--- <br />nearest <br />he*nearest residence. (structure to structure) <br />8. Underground cable shall be laid a depth of not less <br />than 24" below the finished surface. <br />Revised <br />9/18/74/dk <br />
The URL can be used to link to this page
Your browser does not support the video tag.