My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/27/1975
CBCC
>
Meetings
>
1970's
>
1975
>
6/27/1975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 10:23:32 AM
Creation date
6/10/2015 3:44:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
06/27/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECREATIONAL BEACH AND FUTURE MAINTENANCE NOURISHMENT. IT WOULD BE <br />VERY DESIRABLE FOR THE PROJECT TO PROVIDE FOR DEVELOPMENT OF A MORE <br />EFFICIENT SAND TRANSFER SYSTEM AT THE INLET AND PARTICIPATION IN THE <br />OPERATION OF THAT SYSTEM, WE WOULD PREFER TO HAVE THE BREAKWATER <br />GROIN SOUTH OF THE INLET INCLUDED AS AN AUTHORIZED ALTERNATIVE FOR CON- <br />STRUCTION ONLY AFTER ITS NEED IS CLEARLY DEMONSTRATED. A MONITORING <br />PROGRAM SHOULD DEFINITELY BE INCLUDED AS A PART OF A PROJECT IN THIS <br />AREA. THE MONITORING PROGRAM WOULD ASSIST IN THE EVALUATION OF THE <br />PROJECT AND IS PARTICULARLY IMPORTANT FOR ASSESSING THE EFFECTIVENESS <br />OF THE SAND TRANSFER OPERATION AT THE INLET AS WELL AS FOR DETERMINING <br />THE NEED FOR THE DEFERRED STRUCTURE. <br />ON MOTION BY COMMISSIONER WODTKE, SECONDED BY COMMISSIONER <br />SCHMUCKER, THE BOARD UNANIMOUSLY AGREED THAT THE FOLLOWING RECOMMENDATION <br />#2 AND #3 CONCERNING THE CITY OF VERO BEACH BE INCLUDED AS PART OF THE <br />PROPOSED RESOLUTION. <br />WITHIN THE CITY OF VERO BEACH: <br />#2 RECOMMEND AND CONCUR WITH THE CORPS OF ENGINEERS' RECOM- <br />MENDATION FOR BEACHFILL RENOURISHMENT IN THE PROJECT AREA, INCLUDING A <br />BREAKWATER GROIN AS AN AUTHORIZED ALTERNATIVE FOR CONSTRUCTION ONLY AFTER <br />ITS NEED IS CLEARLY DEMONSTRATED. A MONITORING PROGRAM WOULD ASSIST IN <br />THE EVALUATION OF THE PROJECT AND IS PARTICULARLY IMPORTANT FOR ASSESSING <br />THE RESULTS OF THE BEACH -FILL PROJECT. <br />#3 RECOMMEND A TEST REEF KNOWN AS THE SABECON REEF BE AN <br />AUTHORIZED ALTERNATIVE FOR CONSTRUCTION, UNDERTAKEN BY THE CORPS OF <br />ENGINEERS AS AUTHORIZED BY THE UNITED STATES CONGRESS. THIS TEST REEF <br />TO CONSIST OF TWO TANGENTS OF THE REEF WITH NO BEACH FILL ACCOMPANYING. <br />PROJECT MONITORED TO EVALUATE RESULTS. BASED ON THE PROFESSIONAL TESTIMON <br />PRESENTED DURING THE PUBLIC HEARINGS, THIS PROJECT COULD PROVIDE A NEW <br />AVENUE FOR BEACH AND SHORE PROTECTION AND RESTORATION FOR THE ENTIRE <br />COAST OF THE UNITED STATES. <br />ON MOTION BY COMMISISONER WODKTE, SECONDED BY COMMISSIONER <br />MASSEY, THE BOARD UNANIMOUSLY AUTHORIZED THE PREPARATION OF A RESOLUTION <br />WITH THE ABOVE RECOMMENDATION NUMBERS 1,2, AND 3; AUTHORIZBDTHE SIGNATURE <br />OF THE CHAIRMAN AND COPIES OF THE RESOLUTION BE SENT TO ALL STATE AND <br />FEDERAL LEGISLATORS, <br />RESOLUTION NO. 75-37 HAVING BEEN COMPLETED IS HEREBY BEING <br />MADE A PART OF THESE MINUTES. <br />2 <br />JUN 2 71975 <br />Rix*: 23 porg111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.