Laserfiche WebLink
Indian River County Department of Utility Services <br /> 28th Ave,North of 4th St. <br /> Water Main Final Assessment Cost <br /> IRC Project No. UW-99-06-DS <br /> Bid Bid Item Total Unit Est. Total <br /> Item Description Estimated <br /> No. o.f Unit Price <br /> Quantity Measure Price Bid <br /> 1 Supervisor 60 Hr. $18.49 <br /> 2 Laborer $1,109.36 <br /> 240 Far. $14.15 $3,395.08 <br /> 3A Materials(pipe,valves,fittins I LS $4,797.32 <br /> 3B Blackhawk $4,797.32 <br /> IL S $285.14 $285.14 <br /> 3C Vero Chemical Dist. chlorine 1 L.S. $16.95 <br /> 3D CSR America concrete $16.95 <br /> I L.S. 27.25 $27.25 <br /> 4A Equipment-Loader-Backhoe to 115 h 40 Hr $1800 <br /> 4B Equipment-Box Blade $720.00 <br /> 1 L.S. $462.00 $462.00 <br /> 5 Equipment-Service Vehicle(Utility) 100 Hr. $7.50 <br /> 6 Demolition&Debris Removal $750.00 <br /> L.S. $000 <br /> 7 Survey- . $0.00 <br /> 0 L.S. $0.00 $0.00 <br /> 8 Advertising0 L.S. <br /> 9 Permit $2$$ $0.00 <br /> 10 Fed-X I L.S. 0.00 0.00 $250.00 <br /> 11 Paving 0 L.S. $0.00 $0.00 <br /> L.S. $0.00 $0.00 <br /> Force 1RCUS Contingency Account 10% 0 0 $0.00 <br /> -$-0--0-01 <br /> Est.Construction Cost: $11,813.10 <br /> Survey Services $250.00 <br /> Design Services $1,408.00 <br /> Permitting Services $78.00 <br /> Bidding&Award Services $0.00 <br /> Services During Construction $469.00 <br /> Administration $782.00 <br /> PRELDIINARY ASSESSMENT COST: $14,800.10 <br /> EST. SQ. FT. TO BE ASSESSED: 73,172 <br /> EST. COST PER SQUARE FOOT: $0.202265 <br /> (ROUNDED TO 5TH PLACE <br /> • >v -71 <br /> IS <br /> Project-28th Ave.,north of 4th St.Water Mains-Jan 02,2001 <br /> ATTACHMENT 2 <br />