My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/10/1976
CBCC
>
Meetings
>
1970's
>
1976
>
3/10/1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:18 AM
Creation date
6/10/2015 4:45:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/10/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 10 1976 <br />ON MOTION BY COMMISSIONER SCHMUCKER, SECONDED BY COMMISSIONER Loy, <br />THE BOARD UNANIMOUSLY APPROVED THE USE OF A COUNTY DRAGLINE TO UNLOAD THE <br />CARLOADS OF LIMEROCK AS REQUESTED BY J. LEWIS GREENE, DIRECTOR OF PUBLIC <br />WORKS FOR THE CITY OF VERO BEACH. <br />ADMINISTRATOR JENNINGS NEXT DISCUSSED THE RECAPPING OF CITRUS ROAD <br />BETWEEN 43RD AVENUE AND RANGELINE ROAD, HE INFORMED THE BOARD THAT THIS <br />WAS ORIGINALLY DONE ON AN EXPERIMENTAL BASIS AND HAS WORKED OUT VERY WELL <br />ON THIS THREE-MILE STRETCH. IN ORDER TO PRESERVE THE ROAD, WE NEED TO PUT <br />ON ANOTHER INCH OF ASPHALT AS WE ARE SIX MONTHS OVER SCHEDULE TO KEEP THE <br />ROAD AS ORIGINALLY INTENDED. HE CONTINUED THAT WE ONLY HAVE MAINTENANCE <br />MONEY IN THE BUDGET, BUT THIS WILL BE MAINTENANCE AND WILL COST ABOUT <br />$50,000 OR BETTER. <br />THE ADMINISTRATOR STATED THAT HE FELT THIS LAYER WOULD LAST EVEN <br />LONGER THAN THE FIRST SINCE THE STUMP DUMP HAS BEEN CLOSED, WHICH ELIMINATES <br />A LOT OF HEAVY TRUCKS USING THE ROAD, AND FELT THE NEXT LAYER WOULD LAST <br />EVEN LONGER. <br />ON MOTION BY COMMISSIONER MASSEY, SECONDED BY COMMISSIONER Loy, <br />THE BOARD UNANIMOUSLY AUTHORIZED THE ADMINISTRATOR TO PROCEED WITH THE RE- <br />CAPPING OF CITRUS ROAD BETWEEN 43RD AVENUE AND RANGELINE ROAD IF THE MONEY <br />IS AVAILABLE. <br />CHAIRMAN SIEBERT BROUGHT UP THE MATTER OF HOLDING A WORKSHOP MEET- <br />ING IN SEBASTIAN, AND ASKED THE COMMISSIONERS IF, AFTER CONSIDERATION, THEY <br />HAD ANY OBJECTION TO DOING THIS ON A ONE-TIME BASIS. <br />COMMISSIONER MASSEY STATED THAT IT HAS BEEN DONE IN THE PAST, BUT <br />NOT SUCCESSFULLY, AND HE PERSONALLY FELT COMMISSION MEETINGS SHOULD BE HELD <br />IN THE COMMISSION ROOM. <br />COMMISSIONER WODTKE NOTED THAT THIS IS JUST A WORKSHOP MEETING. <br />COMMISSIONER SCHMUCKER ASKED IF IT WOULD BE HELD IN THE EVENING. <br />CHAIRMAN SIEBERT REPLIED THAT IT PROBABLY WOULD, AND THE CITY <br />COUNCILMEN OF BOTH SEBASTIAN AND FELLSMERE WOULD ATTEND AND QUESTIONS <br />WOULD BE ALLOWED WITH A TIME LIMIT OR COULD BE SUBMITTED BY CARD. <br />COMMISSIONER Loy SUGGESTED THAT CHAIRMAN SIEBERT MIGHT WORK OUT <br />WITH THE MAYOR WHAT SUBJECTS THEY ARE PARTICULARLY INTERESTED IN SO THE <br />MEETING WOULDNIT STRETCH OUT TOO tl LONG, AND IT WOULD BE HELPFUL TO BE ABLE TO <br />PREPARE A LITTLE. SHE CONTINUED THAT SHE WOULD LIKE TO SEE US RESPOND TO <br />THIS REQUEST, PARTICULARLY IF SOME TYPE OF AGENDA COULD BE WORKED OUT. <br />52 <br />;. ? °a_ : 158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.