My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-160
CBCC
>
Resolutions
>
2000's
>
2008
>
2008-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 11:44:49 AM
Creation date
9/30/2015 5:43:45 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2008-160
Approved Date
09/23/2008
Agenda Item Number
8.K.
Resolution Type
Authorization
Entity Name
Florida East Coast Railroad
Subject
Execution of a Railroad Reimbursement Agreement
Installation of grade crossing traffic control devices
Future maintenance and adjustment of traffic control devices
Providing for the expenditures of funds
Providing when this Resolution shall take effect
Area
12th Street
Supplemental fields
SmeadsoftID
5655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXCAVATING EQUIPMENT PER DAY $181.00 4 DAYS $723.00 <br />EQUIPMENT RENTAL PER DAY $125.00 4 DAYS $500.00 <br />FOREDIAN'S TRUCK PER DAY $35.00 4 DAYS $140.00 <br />GANG TRUCK PER DAY $63.00 4 DAYS $252.00 <br />SUPERVISORS TRUCK PER DAY $35.00 4 DAYS 40.00 <br />EQUIPMENT TOTAL <br />$1,756.00 <br />ENGINEERING $1,G00.G0 1 51,000 00 <br />ENGINEERING TOTAL <br />$1,000.00 <br />CONSTRUCTION SUPERVISION $312.00 4 DAYS $1,248.00 <br />LABOR ADDITIVE <br />695.0 <br />SUPERVISION TOTAL $1,943.00 <br />LABOR PER DAY $1,188.90 $9,756.00 <br />NUMBER OF DAYS 4 , <br />LABOR ADDITIVE <br />52,776 00 <br />TOTAL LABOR <br />$7,532.00 <br />GANG EXPENSES PER DAY $602.00 <br />NUMBER OF DAYS 4 <br />TOTAL GANG EXPENSES <br />$2,408.00 <br />SUB -TOTAL <br />CONTINGENCIES 53 <br />$36,075.55 <br />$1,804.00 <br />TOTAL <br />$37,880.00 <br />272196W s <br />DATE: <br />06/21/07 <br />[ <br />FILE: <br />10.2 <br />TYPE: <br />IV <br />CLASS: <br />III <br />FLORIDA EAST COAST RAILWAY <br />N0. OF <br />DAYS: <br />4 <br />OFFICE OF THE GENERAL MANAGER <br />AAR <br />/ <br />DOT 4: <br />272196W <br />OF SIGNALS AND COMMUNICATIONS <br />MILE <br />POST: <br />228+3480" <br />Project <br />Type: <br />FDOT <br />ESTIMATED COST FOR HIGHWAY CROSSING <br />WARNING DEVICES AT <br />12th <br />STREET VERO BEACH. <br />This estimate should be considered <br />void after one (1) <br />year. <br />MATERIAL <br />UNIT <br />COST <br />UNITS <br />TOTAL <br />COST <br />12" RETROFIT LED UNITS <br />$120.00 <br />14 EA. <br />$1,680.00 <br />GENERATOR CASE W/ TRANSFER SWITCH <br />$2,870.00 <br />1 <br />EA. <br />$2,870.00 <br />MISC. GROUND MATERIAL <br />$106.55 <br />1 PEG. <br />$706.55 <br />CABLE <br />$0.00 <br />1 PEG. <br />$0.00 <br />POWER SERVICE <br />$2,000.00 <br />1 EA. <br />$2,000.00 <br />MONITORING EQUIPMENT <br />$10,725.00 <br />1 <br />PKG. <br />$10,725.00 <br />FREIGHT S HANDLING <br />- <br />$4,075.00 <br />TAX @ 6.53 <br />$106000 <br />TOTAL MATERIALS <br />$21,436.55 <br />EXCAVATING EQUIPMENT PER DAY $181.00 4 DAYS $723.00 <br />EQUIPMENT RENTAL PER DAY $125.00 4 DAYS $500.00 <br />FOREDIAN'S TRUCK PER DAY $35.00 4 DAYS $140.00 <br />GANG TRUCK PER DAY $63.00 4 DAYS $252.00 <br />SUPERVISORS TRUCK PER DAY $35.00 4 DAYS 40.00 <br />EQUIPMENT TOTAL <br />$1,756.00 <br />ENGINEERING $1,G00.G0 1 51,000 00 <br />ENGINEERING TOTAL <br />$1,000.00 <br />CONSTRUCTION SUPERVISION $312.00 4 DAYS $1,248.00 <br />LABOR ADDITIVE <br />695.0 <br />SUPERVISION TOTAL $1,943.00 <br />LABOR PER DAY $1,188.90 $9,756.00 <br />NUMBER OF DAYS 4 , <br />LABOR ADDITIVE <br />52,776 00 <br />TOTAL LABOR <br />$7,532.00 <br />GANG EXPENSES PER DAY $602.00 <br />NUMBER OF DAYS 4 <br />TOTAL GANG EXPENSES <br />$2,408.00 <br />SUB -TOTAL <br />CONTINGENCIES 53 <br />$36,075.55 <br />$1,804.00 <br />TOTAL <br />$37,880.00 <br />272196W s <br />
The URL can be used to link to this page
Your browser does not support the video tag.