Laserfiche WebLink
EXCAVATING EQUIPMENT PER DAY $181.00 4 DAYS $723.00 <br />EQUIPMENT RENTAL PER DAY $125.00 4 DAYS $500.00 <br />FOREDIAN'S TRUCK PER DAY $35.00 4 DAYS $140.00 <br />GANG TRUCK PER DAY $63.00 4 DAYS $252.00 <br />SUPERVISORS TRUCK PER DAY $35.00 4 DAYS 40.00 <br />EQUIPMENT TOTAL <br />$1,756.00 <br />ENGINEERING $1,G00.G0 1 51,000 00 <br />ENGINEERING TOTAL <br />$1,000.00 <br />CONSTRUCTION SUPERVISION $312.00 4 DAYS $1,248.00 <br />LABOR ADDITIVE <br />695.0 <br />SUPERVISION TOTAL $1,943.00 <br />LABOR PER DAY $1,188.90 $9,756.00 <br />NUMBER OF DAYS 4 , <br />LABOR ADDITIVE <br />52,776 00 <br />TOTAL LABOR <br />$7,532.00 <br />GANG EXPENSES PER DAY $602.00 <br />NUMBER OF DAYS 4 <br />TOTAL GANG EXPENSES <br />$2,408.00 <br />SUB -TOTAL <br />CONTINGENCIES 53 <br />$36,075.55 <br />$1,804.00 <br />TOTAL <br />$37,880.00 <br />272196W s <br />DATE: <br />06/21/07 <br />[ <br />FILE: <br />10.2 <br />TYPE: <br />IV <br />CLASS: <br />III <br />FLORIDA EAST COAST RAILWAY <br />N0. OF <br />DAYS: <br />4 <br />OFFICE OF THE GENERAL MANAGER <br />AAR <br />/ <br />DOT 4: <br />272196W <br />OF SIGNALS AND COMMUNICATIONS <br />MILE <br />POST: <br />228+3480" <br />Project <br />Type: <br />FDOT <br />ESTIMATED COST FOR HIGHWAY CROSSING <br />WARNING DEVICES AT <br />12th <br />STREET VERO BEACH. <br />This estimate should be considered <br />void after one (1) <br />year. <br />MATERIAL <br />UNIT <br />COST <br />UNITS <br />TOTAL <br />COST <br />12" RETROFIT LED UNITS <br />$120.00 <br />14 EA. <br />$1,680.00 <br />GENERATOR CASE W/ TRANSFER SWITCH <br />$2,870.00 <br />1 <br />EA. <br />$2,870.00 <br />MISC. GROUND MATERIAL <br />$106.55 <br />1 PEG. <br />$706.55 <br />CABLE <br />$0.00 <br />1 PEG. <br />$0.00 <br />POWER SERVICE <br />$2,000.00 <br />1 EA. <br />$2,000.00 <br />MONITORING EQUIPMENT <br />$10,725.00 <br />1 <br />PKG. <br />$10,725.00 <br />FREIGHT S HANDLING <br />- <br />$4,075.00 <br />TAX @ 6.53 <br />$106000 <br />TOTAL MATERIALS <br />$21,436.55 <br />EXCAVATING EQUIPMENT PER DAY $181.00 4 DAYS $723.00 <br />EQUIPMENT RENTAL PER DAY $125.00 4 DAYS $500.00 <br />FOREDIAN'S TRUCK PER DAY $35.00 4 DAYS $140.00 <br />GANG TRUCK PER DAY $63.00 4 DAYS $252.00 <br />SUPERVISORS TRUCK PER DAY $35.00 4 DAYS 40.00 <br />EQUIPMENT TOTAL <br />$1,756.00 <br />ENGINEERING $1,G00.G0 1 51,000 00 <br />ENGINEERING TOTAL <br />$1,000.00 <br />CONSTRUCTION SUPERVISION $312.00 4 DAYS $1,248.00 <br />LABOR ADDITIVE <br />695.0 <br />SUPERVISION TOTAL $1,943.00 <br />LABOR PER DAY $1,188.90 $9,756.00 <br />NUMBER OF DAYS 4 , <br />LABOR ADDITIVE <br />52,776 00 <br />TOTAL LABOR <br />$7,532.00 <br />GANG EXPENSES PER DAY $602.00 <br />NUMBER OF DAYS 4 <br />TOTAL GANG EXPENSES <br />$2,408.00 <br />SUB -TOTAL <br />CONTINGENCIES 53 <br />$36,075.55 <br />$1,804.00 <br />TOTAL <br />$37,880.00 <br />272196W s <br />