My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/19/1976
CBCC
>
Meetings
>
1970's
>
1976
>
5/19/1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:19 AM
Creation date
6/10/2015 4:50:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/19/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � . <br />COMMISSIONER SCHMUCKER STATED HE FOUND IT HARD TO BELIEVE THERE <br />WOULD BE FIVE FEET OF WATER STANDING IN THE DITCH, AND MR. SOLESBEE AD— <br />MITTED THAT HE WAS NOT POSITIVE ABOUT THE DEPTH. <br />COMMISSIONER WODTKE ASKED IF THERE WOULD BE ANY OBJECTION TO <br />MR. SOLESBEE PUTTING SOME FILL IN THE BOTTOM OF THE DITCH. <br />THE ADMINISTRATOR SAID THERE WOULD BE NO OBJECTION AS LONG AS' <br />IT DID NOT BLOCK THE FLOW LINE OF THE PIPE. <br />FURTHER DISCUSSION FOLLOWED AS TO THE DEPTH OF THE WATER AND <br />METHODS OF SOLVING THE PROBLEM, AND ADMINISTRATOR JENNINGS RECOMMENDED <br />THAT A PROFILE BE MADE OF THE DITCH AND A TEMPORARY EASEMENT WORKED OUT. <br />THE BOARD HAD NO OBJECTION. <br />THOMAS BALTIMORE, FIRE CHIEF OF ROSELAND VOLUNTEER FIRE DEPART— <br />MENT, APPEARED TO DISCUSS A BUILDING FOR THEIR FIRE DEPARTMENT. HE IN— <br />FORMED THE BOARD THAT THEY NOW OWN PROPERTY ON WHICH TO ERECT SUCH A <br />BUILDING AND WANT TO PUT UP A 30 X 60 METAL BUILDING. HE STATED IT WILL <br />COST ABOUT $1,100 TO $1,500 FOR THE CONCRETE SLAB AND ROUGHING IN THE <br />PLUMBING, AND THEY WOULD LIKE THE COUNTY TO CLEAR THE PROPERTY AND PUT IN <br />SOME FILL, WHICH IS NECESSARY BEFORE THEY CAN PUT DOWN THE SLAB. <br />COMMISSIONER LOY ASKED IF THEY HAVE ANY MONEY TO BUILD THE <br />BUILDING. <br />MR. BALTIMORE STATED THAT SO FAR THEY HAVE ONLY $2,300.00, BUT <br />HAVE SOME FUND RAISING PLANS. HE CONTINUED THAT THEY WILL JUST GO STEP <br />f + <br />BY STEP AND POSSIBLY COULD MORTGAGE THE LAND TO FINANCE THE BUILDING. <br />j THE COST OF THE METAL BUILDING WILL BE $7,900.00. ALL THEY ARE ASKING <br />NOW IS FOR THE COUNTY TO CLEAR THE PROPERTY AND PUT IN SOME FILL SO THEY <br />CAN PUT THE SLAB DOWN. <br />COMMISSIONER WODTKE INFORMED THE BOARD THAT THE FIRE STUDY <br />COMMITTEE HAD A MEETING LAST WEDNESDAY, MAY 12TH, WITH THE MAYORS OF THE <br />VARIOUS MUNICIPALITIES AND ARE UPDATING FIGURES AS TO FUTURE OUTLOOK. <br />a HE CONTINUED THAT HE WILL HAVE A MEETING WITH THE VOLUNTEERS HOPEFULLY <br />WITHIN THE NEXT WEEK OR TWO AND GET THEIR INPUT, HE NOTED THAT HE HAS. <br />TALKED TO PEOPLE IN THE SOUTH END OF THE COUNTY WHO WOULD LIKE TO DO <br />'i SOMETHING ALONG THE SAME LINE AS THE ROSELAND VOLUNTEER FIRE DEPARTMENT, <br />AND HE FEELS A STUDY SHOULD BE DONE TO DETERMINE WHETHER IT IS BETTER TO <br />HAVE SMALLER UNITS SCATTERED AROUND THE COUNTY OR LARGER MORE CENTRALLY <br />LOCATED DEPARTMENTS. <br />12 <br />ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.