Laserfiche WebLink
3/1/2006- 3:14:36 PM <br />u,.. <br />'Li AA <br />A U v <br />u -6 <br />a <br />X <br />X <br />X <br />X <br />X <br />X <br />Reference <br />Construction <br />Contract Documents <br />(Location in <br />Contract) <br />Page 24, Paragraph 30 <br />Page 21, Paragraph 21 <br />See Contract <br />Documents and <br />Specifications <br />Page 24, paragraph 29, <br />Section 2 <br />Page 24, Paragraph 29 <br />Section 2 <br />Page 24, Paragraph 231 <br />Page 44, Paragraph 50 <br />and 51 of General <br />Conditions <br />N <br />N <br />OA <br />N <br />PH <br />District Monitoring <br />Responsibilities <br />Review bid document for <br />exclusion of provision. <br />Review bid document for <br />inclusion of the provision. <br />See page 72 of the CACC <br />Review documents to ensure <br />Local Agency is using <br />FDOT's specifications for <br />construction projects on the <br />SHS Page 91 of CACC <br />Review bid document for <br />exclusion of state or local <br />preferences. <br />Review bid document for <br />exclusion of materials <br />furnished by Local Agency. <br />Review bid document for <br />inclusion of the provision. <br />Review bid document for <br />inclusion of the provision. <br />Review bid document for <br />inclusion of the provision. <br />Local Agency Responsibility <br />Do not allow in contract. <br />Develop contract language to ensure that <br />requirements of 23 CFR 635.109 are met. <br />Sections 4-3.2 and 5-12.6 ofFDOT <br />Supplemental Specifications and Sections 4-3 <br />and 5-12 ofFDOT Standard Specifications <br />may be used for guidance. <br />Local Agency will use current FDOT's <br />specifications when the construction project is <br />on the SHS <br />Do not allow in contract. <br />Ifutili7ed, must obtain FHWA approval. <br />Develop contract language to meet the <br />requirements. <br />Develop contract language for termination for <br />cause, convenience, and default and include in <br />bid document. <br />Include reasons time extensions are allowed in <br />specifications. May use section 8-7.3.2 of <br />FDOT Standard Specifications. <br />Non - <br />Federal -aid <br />Highway/ <br />Non -SUS <br />Yes <br />z <br />z <br />z <br />z <br />z <br />C <br />O <br />G <br />O <br />z <br />Yes <br />z <br />N <br />r <br />z <br />z <br />ztn <br />cn <br />o <br />Yes <br />z <br />>-, <br />C-I3 v) <br />by M <br />U <br />ral <br />^ <br />7. <br />N <br />IN <br />N <br />u <br />0 <br />a3 <br />49 CFR 18.36 <br />23 CI'R <br />635.109 <br />23 CFR 630B <br />23 CFR <br />635.409 <br />23 CFR <br />635.407 <br />N VD <br />• <br />N VD <br />N 'D <br />Requirement <br />29. Salvage Credits <br />30. Standardized <br />Changes Conditions <br />Contract Clauses <br />31. Standard <br />Specifications and <br />Plans <br />32. State preference <br />33. State/Local <br />Owned/Furnished/Desi <br />mated Materials <br />34. Subcontracting <br />35. Termination of <br />contract <br />36. Time extensions <br />F:\Engineering\Capital Projects\0202IndianRiverDr.NoConstruction Contract Checklist 2-23-06.doc <br />