Laserfiche WebLink
IRRIGATION SYSTEM - OPINION OF CONSTRUCTION COST <br /> SR 5/US <br /> -Indian River County <br /> FPID 228583-5-52-01 <br /> Prepared By: Masuen Consulting,LLC <br /> Date: September 7,2006 <br /> Revised: N/A <br /> Pay Item Item Unit Qty. Unit Price Total <br /> PVC Main Line <br /> 4" LF 8,450 $6.50 $54,925.00 <br /> PVC Lateral Line <br /> 3/4"-2 1/2" LF 14,235 $3.00 $42,705.00 <br /> PVC Sleeving <br /> 8" LF 1,350 $11.00 $14,850.00 <br /> 2"gray LF 1,350 $4.50 $6;075.00 <br /> Ductile Iron GV <br /> 4" 1 LF I 1 2 $800.00 1 1 $1,600.00 <br /> RCV <br /> 590-70 2„ EA 27 $600.00 $16,200.00 <br /> 1-1/2" 1 EA 1 1 4 $500.00 1 1 $2,000.00 <br /> Spray Heads <br /> 6"and 12"and Risers EA 895 $50.00 $44,750.00 <br /> Pump Station <br /> Hoover HSF-5.00S,230/3-A,E40,W EA 1 $10,000.00 $10,000.00 <br /> Sub Total $193,105.00 <br /> Profit/Overhead $38,621.00 <br /> 590-70 Grand Total Ls7 1 $231,726.00 <br />