Laserfiche WebLink
Fir <br />.1 M <br />SEP 8197.6 <br />9999 <br />.,,�.;..:�: • 9999._.._ �.....� C ..:•.�.:............_..:�_ <br />:. 9999. • . • � •` <br />s�LECTRrCAL PERMIT FEES <br />When appltcatton for permtt is approved and <br />before a7permtt is tesued, <br />a fee therefor shall be patd on the following schedule of rates: <br />` Present <br />Bldg. Dtr. County Adm. <br />LIGHT OUTLETS • Fees <br />Recom'd Becom'd <br />•1 to.8 outlets, inclustve - mtntmum <br />4.00 <br />over 8 outlets; the minimum charge of ' <br />$4900 jar the, first 8 outlets plus <br />. each addtttonal outlet <br />.10 .• <br />STsRPICES •' <br />- Temporary for constructton <br />5.00 <br />100 ampere and under <br />2.00 <br />Over 100•ampere to 200 ampere <br />3.00 <br />Over 200 ampere to 400 ampere <br />4.00 <br />' Over 400 ampere to 600 ampere <br />5.00 <br />= Over 600 ampere to 800 ampere <br />6.00 <br />For each addtttonal 100• ampere (over 800) <br />1.00 <br />SERVICE CHANGES - <br />100 ampere and under ; <br />5.00 <br />' <br />Over 100 ampere ta-200 ampere <br />5.00 <br />Over 200 ampere to 400 -ampere <br />6.00 <br />Over 400 ampere - each add'l 1.00 ampere : ' <br />1.00 . <br />SWITCHBOARDS OR PANELS <br />By amperes, same as"Servtces" <br />EQUIPMENT <br />Drop to range <br />1.50 <br />Bange Top <br />1.00 <br />Oven <br />1.00 ' <br />Satan outlet ; <br />1.00 <br />- and all other appliance. outlets <br />tnspected•tn conjunctton with rough <br />'• <br />miring,' including room space heaters, <br />- <br />ceitling heat, etc. each <br />1.00 <br />MOTORS ; <br />- Up to 1 H. P., <br />1.00 <br />- ; - . <br />1 to 3 H. P. - <br />2.00. <br />3 to 5 H.P. <br />3.00 <br />• Over 5 H.P. up . to 10 B.P. (per acid 12 H.P. J, <br />1.00 <br />f0.ff. P. <br />8.00. <br />;,Over 10 H. P. (per add'.1. H.P.) <br />.25 <br />- KACHINES <br />X -Ray - Portable, dentist <br />2.50 <br />'a Ray - Stattonary; doctor. <br />5.00 <br />Dtathermic and Electronte outlet <br />12.50 <br />GENERATORS & TRANSFORMERS <br />.. <br />Each up to 5 KYA <br />2:.00 <br />Bach generator or transformer over <br />5 KY.4. -thru 10 RYA <br />4.00 <br />Bach generator or.transformer over <br />i <br />10 - KYA thru 15 KYA <br />6.00 <br />Bach generator or transfad•mer over <br />15 RYA '. .r:: 20 KYA. <br />8.00 <br />' <br />Bagh generator- or transformer over <br />, <br />Z- KYA ahru 25 KYA ( <br />10.00 <br />' Fa�A generator or transformer over .-.:. <br />�. <br />' 25 KYA thru 30 KYA <br />15.00 <br />' <br />• Isaeh generator or transformer over <br />30 RYA <br />15.00. <br />Generators and transformers, where -located <br />• on same floor, fee for largest, plus $1.00 <br />' <br />for each addtttonal <br />, <br />ULDING NA CHINES <br />' <br />Up to 25 amperes <br />2:00 <br />. Over 25 amperes to 50 amperes <br />j 00 <br />Over 50 amperes - plus $2.00 for each <br />addittonal 25 amperes or fraction part <br />, <br />thereof <br />.:.., <br />'• .. <br />SEP 8197.6 <br />9999 <br />