Laserfiche WebLink
RESOLUTION NO. 2004 - 039 <br />development regulations (LDRs) to be provided between mobile home development <br />and lower density residential development. <br />B. Phase 2 of the motor Subd visie.n Turtle Run project shall be designed and <br />constructed to provide a paved roadway connection to 12th Street or to adjacent <br />property that is directly connected to 12th Street via paved roadway. <br />Phase 2 of the B'„o Water S„r.divi,ie Turtle Run project shall include the design and <br />construction of a left turn lane and a right turn deceleration lane at the 82nd Avenue <br />entrance as demonstrated by the Indian River County approved Traffic Impact <br />Analysis dated January 26, 2004. Said turn lanes shall meet or exceed county <br />standards. As . alte.y,ative to p ;, ing the tuf lane the . pi;eant „ pr-evide t„ <br />... _....J ...., ... ».,....1.,.» ..... ... ..... .... »...J .. »ate.., ....b....,...� ».... .� .._.. ...__"_J .._., ...�___"__.,._»..�., <br />then tie tttm !a-ne shall be <br />7 <br />r-equir-ed. <br />Phase 2 of the Turtle Run project shall include paved access from the project entrance <br />driveway to 82nd Avenue along 12th Street. The cost sharing and timing conditions <br />will be established by an Indian River County approved Developers Agreement. <br />C. An average of 10 square feet of upland/wetland buffer per linear foot of functioning <br />wetland (excluding deep water habitat) will be provided for along wetland edges <br />within the Turtle Run project. <br />Coding: Words in stfiket4etigk are deletions from the previous D.O. resolution. Words underlined <br />are additions. <br />rd <br />