My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1976
CBCC
>
Meetings
>
1970's
>
1976
>
11/3/1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:20 AM
Creation date
6/10/2015 4:30:38 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/03/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXTERMINATING CO, FOR EMERGENCY WORK ON THE COURTHOUSE AND AUTHORIZED THE <br />CHAIRMAN TO SIGN THE CONTRACT AS PER THEIR LETTER OF OCTOBER 28, 1976, <br />WHICH IS HEREBY MADE A PART OF THE MINUTES, <br />Coy'ritOL �� ')if CONI"ROL. POST OFFICE BOX 1173, VERO BEACH, FLORIDA 32966 <br />NOV 31976 <br />c�ataareiinaliny (2 <br />Mr. Jack Jennings <br />County .Road & Bridge Department <br />Indian River County Court house <br />Vero beach, Fla. <br />Dear ir1r. Jennings- <br />Per <br />ennings: <br />October 28, 1976 <br />OCT 1976 "' <br />►."ECEIVF-D, <br />eOARD coU„Il <br />caa:latsstotEG� <br />Per your request, we are submitting our proposal and treating <br />specifications for the Indian River. Court house, Vero Beach, <br />Florida. <br />We will treat the entire building for the control of Subterranean <br />termites using a 4 lb. -Aldrin emusifiable solution, bearing E.P.A. <br />registeration ;4887-27, registered by Stephenson Chemical Corp., <br />College Park, Georgia. All treatment will be sub -surface, <br />including the dirt filled basement areas. Application shall be <br />at the approximate rate of 4 gallon per 10 lineal feet on both <br />side of foundation walls. Voids shall be treated, where applicable, <br />at the rate of 2 gallons per 10 lineal feet. <br />The contract shall be subject to the unknown factors involved in <br />the construction of the "North -End Addition", including, the induction <br />of concrete to prevent settlement of the "North wing". Should "long <br />rodding" become impossible, the price shall be reduced accordingly. <br />All work will be done on those days in which the normal operation <br />of the building has ceased (example: Nov. 11, 1976 - Nov. 26, 1976 <br />and thos=e Saturdays required to -complete the job in November 1976). <br />No work will be done between 8:00 A.M. and 5:00 P.M., Monday thru <br />Friday, of which is a normal work day for the occupants of the <br />Indian River County Court house. <br />As stated previously, all chemical will be applied sub -surface, <br />therefore we anticapate chemical odor to be at a mimimum. <br />The cost for the entire work will be as follows (estimated at 5 <br />days work for completion). <br />Normal Contract Cost $813.00 <br />Nan -Normal Duty J1our Labor Cost <br />(Overtime) 305.00 <br />TOTAL COST $1118.00 <br />m <br />43 <br />ee , <br />��� 27>+.1.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.