Laserfiche WebLink
COMMISSIONER SIEBERT REQUESTED THAT THE ADMINISTRATOR CHECK ON <br />A POSSIBLE SITE CONSISTING OF UNIMPROVED PASTURE LAND WHICH IS LOCATED <br />NORTH OF THE CORRIGAN RANCH, AND THE ADMINISTRATOR INDICATED HE WOULD DO SO. <br />DISCUSSION FOLLOWED ON SITE N0, 3 WHICH WAS PRESENTED AS FIRST <br />CHOICE IN THE REPORT OF THE SOLID WASTE COUNCIL ADVISORY COMMITTEE AND IS <br />LOCATED WEST OF KINGS HIGHWAY IN THE VICINITY OF KINGSBERRY AND LINDSEY <br />ROADS, <br />THE POSSIBILITY OF HAVING TO GO TO CONDEMNATION WAS DISCUSSED <br />AND ALSO HOW TO GO ABOUT PAYING FOR A LANDFILL. SITE. <br />ATTORNEY COLLINS SUGGESTED, SINCE THIS MATTER AFFECTS EVERYONE <br />IN THE COUNTY, THERE WOULD BE NOTHING WRONG WITH OBTAINING A LOAN AND THEN <br />USING THE CHARGES MADE FOR USE OF THE LANDFILL TO REPAY THE LOAN. <br />-IT WAS NOTED THAT IT WOULD TAKE A LONG TIME TO ARRANGE SUCH A <br />LOAN, AND THE BOARD THEN DISCUSSED SETTING UP A SPECIAL TAXING DISTRICT <br />AS AN ALTERNATIVE. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />SCHMUCKER, THE BOARD UNANIMOUSLY AUTHORIZED THF EMPLOYMENT OF ENGINEER <br />.JAMES BEINDORF TO WORK WITH THE SOLID WASTE COUNCIL ADVISORY COMMITTEE AS <br />SUGGESTED IN ITEM 3 OF THEIR REPORT AS FOLLOWS: <br />Item 3. Selection of Engineering Firm: <br />Using existing Engineering Firm <br />resumes - select an engineering firm by 12/15/76. <br />Engineering Firm - Instructions to: <br />(A) Inspect.County selected sites - 12/15/76. <br />(B) Prepare feasibility reports on 3 sites - 12/15/76. <br />(C) Report to County Commission on No. 1 site and present <br />feasibility report - 2/2/77. <br />(D) Instruct Engineering Firm to proceed with preparation of <br />plans and documentation necessary and act as County Agents <br />to DER & other regulatory agencies for permits - 2/2/77. <br />(E) Instruct Engineering Firm to prepare plans and specifications <br />for construction on permanent site - 4/20/77 or 5/4/77. <br />(F) Instruct Engineering Firm to deliver plans and specifications <br />for construction by - 6/1/77. <br />CHAIRMAN WODTKE INSTRUCTED THE ADMINISTRATOR TO SELECT ONE OR <br />TWO ADDITIONAL SITES FOR LANDFILL PURPOSES. <br />CHAIRMAN WODTKE INSTRUCTED THE ADMINISTRATOR AND COMMISSIONER <br />Loy, TOGETHER WITH ENGINEER BEINDORF, TO WORK UP A PROJECT SCHEDULE THAT <br />L3 <br />it <br />felt 27- IN285 <br />