My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/1/1976
CBCC
>
Meetings
>
1970's
>
1976
>
12/1/1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:20 AM
Creation date
6/10/2015 4:34:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/01/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D C 11976 <br />COST ANALYSIS <br />UTILITIES RELOCATION <br />17TH STREET BRIDGE PROJECT <br />WITHIN THE CORRIDOR ONLY <br />Water and Sewer - <br />$ <br />214,156.00 <br />Less Salvage <br />11,020.00 <br />* <br />$ <br />203,136.00 <br />Electric -* <br />178,213.00 <br />Total <br />$ <br />381,349.00 <br />This figure is the result of extracting <br />from the original recap by jobs of four <br />items designated thereon and transferring <br />same to the Electric Phase of the project <br />for accounting purposes. <br />* This figure is the result of adding only <br />the Corridor items marked (V) on the <br />Black & Veatch list attached hereto. - <br />$ <br />119,684.00 <br />Adding the engineering and overhead <br />5,984.00 <br />costs computed as shown on copy of <br />12,567.00 <br />work sheet attached hereto <br />2,513.00 <br />Adding the electric costs extracted <br />from -the recap of jobs <br />37,465.00 <br />$.178,213.00 <br />d r 27 1, 346 . <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.