Laserfiche WebLink
o <br />For the most part, the existing facilities to be removed or relocated <br />and the proposed new facilities are located on public street right of way, <br />the exception being facilities at the power plant site and City Waste <br />Treatment Plant site adjoining the power plant. <br />The City, as contracting authority, proposes to take public bids and <br />let a construction contract for the Electric Utilities Adjustments. The <br />plans and specifications have been prepared by Black and Veatch, Consulting <br />Engineers, Kansas City, Missouri and Orlando, Florida and the'City proposes <br />to use Black and Veatch for construction supervision and inspection of the <br />work. <br />This report includes a general description of the work, a detailed cost <br />estimate, and a location map. <br />DESCRIPTION AND SCOPE OF THE WORK <br />GENERAL <br />This section covers the project description, the scope, and general <br />requirements for work to be performed for the City of Vero Beach, Florida <br />under a proposed contract designated ELECTRIC UTILITIES ADJUSTMENTS, 17th <br />STREET AND CAUSEWAY BOULEVARD. <br />PROJECT DESCRIPTION <br />The Florida Department of Transportation is preparing for the construc- <br />tion of a bridge across the Indian River at 17th Street -Causeway Boulevard <br />in Vero Beach, Florida. In connection with this project they are preparing <br />to let a contract for the widening of 17th Street from highway US -1 east to <br />the Indian River and Causeway Boulevard from the Indian River east to high- <br />way AIA, all under State Road Job No. 88003-1501. <br />DEC <br />