Laserfiche WebLink
v (a �4] �- - a � :-j 3 .� <br />I <br />December 6, 1976 -2- <br />1. (continued) <br />at the time the 'couizty's proposed water line 'is <br />completed. Please refer to the attached sketcTi,• <br />2. As a second alternative, Ralmar would construct <br />a 12 inch water line north from the City water <br />plant in the easements and right-of-ways owned or <br />acquired by the county west of the Florida East Coast <br />Railroad. This line would be constructed according <br />to the ;dans and specifications designed for the pro- <br />posed line that the county is now contemplating. Under <br />this alternative this line would also terminate at a <br />point west of the north half of the right-of-way of <br />the new access road to the new hospital. The county <br />would then agree to reimburse Ralmar for the cost of <br />this 12 inch line at the time the county completes <br />the balance of the water line and system that they <br />are presently planning. Ralmar would install a pumping <br />station with the capacity to serve only its project, at <br />the present time, and would abandon that station when the <br />county completes the balance of their system and installs <br />a pumping station for the entire area to be served. See <br />the attached sketch. <br />Of course, with either alternative, Ralmar will construct a water <br />line sized to service our project, from our property west along <br />the south right-of-way of the hospital's access road, under the <br />state highway and the railroad tracks to tie into the line. The <br />line from our property will be built to county specifications and <br />will be deeded the county upon county approval and formal ac- <br />ceptance by the County Commission. <br />In summary, we are making this request to allow ourselves adequate <br />time to complete all the necessary engineering,permits and con- <br />struction to have service available to coincide with completion of <br />our first cluster. As we indicated previously we are anticipating <br />completion of our first cluster near the time the new hospital <br />is finished and opened. <br />Thank you for your consideration of this matter. <br />Sincerely, <br />Mark C. Falb <br />President <br />Copies: <br />DEC 151976 <br />Jack Jennings, County Administrator <br />James Beindorf, Beindorf and Associates <br />