My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/1976
CBCC
>
Meetings
>
1970's
>
1976
>
12/15/1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:20 AM
Creation date
6/3/2015 10:59:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/15/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION FOLLOWED, AND IT WAS NOTED THAT IF FOR SOME REASON <br />THE COUNTY LINE DID NOT GO UP THERE, RALMAR COULD END UP WITH A 12" WATER <br />LINE, <br />COMMISSIONER SIEBERT ASKED IF RALMAR WAS READY TO PROCEED, AND <br />. <br />:MR. FALB STATED THAT THEY WERE READY TO START NEXT WEEK. <br />MR. FALB POINTED OUT THAT IF THEY DID PUT IN A 6" LINE, IT SIMPLY <br />WOULD BE ABANDONED WHEN THE COUNTY PUT IN THEIR 12" LINE, AND IF THEY <br />BUILD THE 12" LINE, IT CAN THEN BE TURNED OVER TO THE COUNTY AND THEY CAN <br />TAP INTO IT. IN OTHER WORDS, THEY WOULD SIMPLY BUILD THE LINE FOR THE <br />COUNTY AHEAD OF TIME WHICH WOULD SAVE TEARING UP THE EASEMENT TWICE. <br />INTERGOVERNMENTAL COORDINATOR THOMAS INFORMED THE BOARD THAT HE <br />DOES`'NOT BELIEVE THAT RALMAR COULD BE REIMBURSED FOR THIS WATER LINE OUT OF <br />THE GRANT FUNDS, <br />CHAIRMAN WODTKE INQUIRED AS TO THE COST OF.THE 12" LINE AS COM- <br />PARED TO THE 6" LINE. <br />CONSULTING ENGINEER .JAMES BEINDORF ESTIMATED THE 12" LINE WOULD <br />COST APPROXIMATELY X20,000 AS OPPOSED TO $12,000 TO $13,000 FOR A 6" LINE. <br />THIS COST WOULD BE JUST FOR THE LINE UP. TO WHERE RALMAR WOULD NORMALLY TIE <br />INTO THE COUNTY LINE. <br />CHAIRMAN WODTKE BROUGHT UP THE QUESTION OF COMPETITIVE BIDDING <br />ON THIS PROJECT, <br />MR, FALB STATED THAT WHEN THE COUNTY PUTS THE WHOLE LINE OUT FOR <br />BIDS, THEY WOULD AGREE TO BE REIMBURSED ON WHATEVER BASIS THE BID IS <br />AWARDED, <br />ATTORNEY COLLINS NOTED THAT THIS IS A SINGLE AND UNIQUE -TYPE <br />SITUATION, AND HE DOES NOT FEEL IT WOULD REQUIRE A BID. <br />DISCUSSION CONTINUED AS TO WHETHER THIS WOULD BE REIMBURSABLE <br />UNDER THE GRANT, AND COMMISSIONER Loy POINTED OUT IF A PORTION OF THE LINE <br />WERE ALREADY COMPLETED, IT WOULD ALTER THE GRANT APPLICATION. THE BOARD <br />AGREED THEY DID NOT WANT TO ALTER THE APPLICATION IN ANY WAY. <br />MR. FALB NOTED THAT THEIR MAIN PROBLEM IS TIMING, <br />COMMISSIONER SCHMUCKER SUGGESTED THAT RALMAR ONLY BUILD THE 6" <br />LINE THAT WOULD BRING THEM TO WHERE THEY TIE INTO THE COUNTY LINE AND THEN <br />SEE WHAT THE STATUS OF THE GRANT IS, <br />• 30 <br />DEC 15 1976 too 27 459 <br />
The URL can be used to link to this page
Your browser does not support the video tag.